Loading...
Vista Properties-LR 960820A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: CENTEX HOMES DATE: 8/20/96 (F /K/A VISTA PARTNERS) DALLAS, TEXAS PROJECT: SANITARY SEWER & WATER OUR REPORT NO. IMPROVEMENTS COPPELL, TEXAS TEST DATA: 96562 -9 TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MO IS , �TURE MAXIMUM LAB DRY P DENSITY IN PLACE MOISTURE IN PLACE DRY DENSITY COMPACTION PERCENT COMMENT` 72 08/20/96 FG - 6.0 2 9.8 108.0 10.2 107 99 1 -A 73 08/20/96 FG - 5.0 2 9.8 108.0 10.9 105 97 1 -A 74 08/20/96 FG - 4.0 2 9.8 108.0 11.1 105 97 1 -A 75 08/20/96 FG - 3.0 2 9.8 108.0 10.5 105 97 1 -A 76 08/20/96 FG - 2.0 2 9.8 108.0 10.8 105 97 1 -A 77 08/20/96 FG - 1.0 2 9.8 108.0 11.1 104 97 1 -A 78 08/20/96 FG 2 9.8 108.0 1 10.6 105 97 1 -A TEST LOCATION: 72 12" SANITARY SEWER LINE "D" STA: 4 + 50 73 12" SANITARY SEWER LINE "D" STA: 4+25 74 12" SANITARY SEWER LINE "D" STA: 4+00 75 12" SANITARY SEWER LINE "D" STA: 3+75 76 12" SANITARY SEWER LINE "D" STA: 3+50 77 12" SANITARY SEWER LINE "D" STA: 3+00 F 1 12" SANITARY SEWER LINE "D" STA: 2+75 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS Res ully Submitted, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS " 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS AL HA TESTING," 4. CEMENT TREATED D. RETEST ,_DAVID T) ST�ER A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: CENTEX HOMES DATE: 8/20/96 (F /K/A VISTA PARTNERS) DALLAS, TEXAS PROJECT: SANITARY SEWER & WATER OUR REPORT NO. IMPROVEMENTS COPPELL, TEXAS TEST DATA: 96562 -9 -A TEST NO. DATE I ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOIS MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE SURE IN PLACE DRY DENSITY PERCENT COMPACTION COMMENT' 79 08/20/96 FG - 4.0 1 20.5 99.5 21.9 95 96 1 -A 80 08/20/96 FG - 3.0 1 20.5 99.5 22.6 96 96 1 -A 81 08/20/96 FG - 2.0 1 20.5 99.5 21.9 96 96 1 -A 82 08/20/96 FG - 1.0 1 20.5 99.5 21.5 96 97 1 -A 83 08/20/96 FG 1 20.5 99.5 20.9 98 98 1 -A 84 08/20/96 FG - 4.0 1 20.5 99.5 21.7 96 96 1 -A 85 08/20/96 FG - 3.0 1 20.5 99.5 22.0 96 97 1 -A TEST LOCATION: - 79 12" SANITARY SEWER LINE "B" STA: 2 + 50 80 12" SANITARY SEWER LINE "B" STA: 1+85 81 12" SANITARY SEWER LINE "B" STA: 1+40 82 12" SANITARY SEWER LINE "B" STA: 0+75 83 12" SANITARY SEWER LINE "B" STA: 0+25 84 12" SANITARY SEWER LINE "B" STA: 4+00 85 12" SANITARY SEWER LINE "B" STA: 3+75 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respectfully Submitted, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALP TESTING, I j 4. CEMENT TREATED D. RETEST l DAVI ) S rrT E COM 083- 13 A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: CENTEX HOMES DATE: 8/20/96 (F /K/A VISTA PARTNERS) DALLAS, TEXAS PROJECT: SANITARY SEWER & WATER OUR REPORT NO. IMPROVEMENTS COPPELL, TEXAS TEST DATA. 96562 -9 -B TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY pCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT' 86 08/20/96 FG - 2.0 1 20.5 99.5 21.6 98 98 1 -A 87 08/20/96 FG - 1.0 1 20.5 99.5 22.0 97 97 1 -A 88 08/20/96 FG 1 20.5 99.5 21.3 97 97 1 -A TEST LOCATION: 2 86 12" SANITARY SEWER LINE "B" STA: 3 + 50 87 12" SANITARY SEWER LINE "B" STA: 3 + 75 88 12" SANITARY SEWER LINE "B" STA: 2 + 90 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respeg3f1111y Submitted, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS A PHA TES G, INC. ' 4. CEMENT TREATED D. RETEST DAVID TE 0001093 -1e