DR8902-CS 890522 GINN, INC. CONSULTING ENGINEERS Mr. Russ__ Doyle, P.E. City of ~oppell . P.O. Bo/ 478 Coppe~, TX 75019 Re: /Beth. el School Road/Pelican Lane Drainage Improvements Dear Mr. Doyle: Pursuant to your May 9, 1989 memo directing us to prepare the necessary documents to advertise and take bids on the above referenced project, we have prepared 2 consultant work order forms for your signature and authorization to proceed. The first is for design and the second is for inspection and testing. Prior to preparing the attached work authorization forms, we researched our files and found no previous authorized consultant work orders. We greatly appreciate the opportunity to provide professional engineering services to the City of Coppell and will be ready to begin the work immediately upon receipt of the executed consultant work order form. Should you have any questions, please do not hesitate to contact us. Sincerely, H. Wayne Ginn, P.E. HWG/GF/dsp cc: Frank Trando Gabe Favre File 89416 enclosures 17103 Preston Road · Suite 100 ® LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 CITY OF COPPELL ~' Consultant Work Ord~ ~' Date May 22, 1989 TO: Consultant Ginn, Inc. Consulting Engineers Description Of Proposed Project: Preparation of plans, specs and contract documents including surveying and engineering design for Drainage Improvements to Bethel School Road and Pelican Lane, Northlake [~odlands - Phase 6 based upon recon~nedations presented in March 10, 1989 Preliminary Engineering Study and Report. Reference or Purpose of Project: Follow-up to recommendations made in above mentioned report and response to neighborhood representatives request to provide relief and/or protection to residential structure. Staff Contact: Authorization For Project: City Manager/Director Signature Estimated Project Cost As Follows: Number of Hours of Labor N/A Labor Cost $ N/A Material Cost $ N/A Total F. stimated Cost $ 9680.00 Comments: Surveying and engineering costs only. Does not include meetings, testing, or inspection. Estimated Time Required to Complete Project: 30 days Project Manager: Gabe Favre Telephone # (214) 248-4900 Consultant's authorized Signature Project Number assigned Funding Source: Fund G/L account No. account Description Funding and Approval: Director of Finance Date --' CITY OF COPPELL Consultant Work Ord~ Date May 22, 1989 _ "' TO: Consultant Ginn, Inc. Consulting Engineers Description Of Proposed Project: Provide construction inspection and testing £or Drainage Improvements to Bethel School Rd. and Pelican Lane, Northlake Woodlands Phase 6 Reference or Purpose of Project: Staff Contact: Authorization For Project: City Manager/Director Signature Estimated Project Cost As Follows: Number of liours of Labor min. 120 hrs. Labor Cost $ 40.00/hr. max. 200 hrs. Material Cost $ Total Estimated Cost $ min. $4800 00 - max. $8000.00 foremen ts: indeterminate at this time - estimate Estimated Time Required to Complete Project: 30-50 day contract time - w Project Manager: Gabe Fay-re Telephone # { 214 } 248-4900 Consultant's Authorized Signature ' Project Number Assigned Funding Source: Fund G/L Account No. Account Description Funding and Approval: Director of Finance Date