ST0301-CS050215 (3) ~-) o~o \ Construction Phasing- Installation of warning siganage should occur at least 1 month prior to the start of construction Length of construction was based on 200 ftI day concrete placement for road 250 ftI day Underground Utilities 500 ftI day placement of Lime treatment Other construction to be done following opening of roadway lanes. This will inlcude driveways, sidewalks, architectural, landscaping, and other miscellaneous site work. South Cappel! Sta. 1 +25 to Sta. 5+50 to occur concurrently with the replacement of the box culvert. Both East and West side to be done simultaneously while box culvert is being replaced. Construction Time (Assuming Precast Box) Install Traffic Control 0.25 Demolition 0.5 Foundation 1 Installing Box 1 Finish Road & Railings 1 TOTAL 3.75 WeeK WeeK WeeK WeeK WeeK South Coppell reconstruction from Sta. 5+50 to Sta. 18+50 will be divided into north bound and South bound lanes constructed first to allow for the construction of the Storm Drain Construction Time WeeK WeeK WeeK WeeK 1 1 0.5 1.5 TOTAL 4 Construction of the north bound lanes will cause the traffic flow to flow one way going south. Construction Time Place Utilities Cut to Grade Lime Treatment Form and Pour Road Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road 0.25 1 1 0.5 1.5 4.25 TOTAL WeeK WeeK WeeK WeeK WeeK Bethel Road - Sta. 4+50 to Sta. 9+75. Will be divided in to east and west bound lanes. West bound lanes reconstructed first along with SO trunk line. Traffic will be allowed to travel east bound only. The traffic can be rerouted south along S. Coppell Road to Bums St. or Southwestern Blvd. Construction Time West Bound 0.25 0.5 1 0.5 1 TOTAL 3.25 East bound lanes construction to follow west bound lane completion. Construction Time East Bound 0.5 1 0.5 1 3 Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road Place Utilities Cut to Grade Lime Treatment Form and Pour Road TOTAL WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK Sta. 9+75 to Sta. 14+00 total area to be constructed with the construction of the box culvert. Construction Time (Assuming Precast Box) Install Traffic Control 0.25 Demolition 0.5 Foundation 1 Installing Box 1 Finish Road & Railings 1 TOTAL 3.75 WeeK WeeK WeeK WeeK WeeK Sta. 14+00 to 23+00 will have divided construction. West bound lanes reconstructed first along with Storm Drain line in Mitchell St to be placed prior to start of phase Construction Time West Bound 1 1 0.5 1 3.5 Place Utilities Cut to Grade Lime Treatment Form and Pour Road Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road TOTAL Construction Time East Bound 0.25 0.5 1 0.5 1 TOTAL 3.25 WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK Sta. 23+00 to 28+00 will have divided construction. East bound lanes reconstructed first Construction Time West Bound 0.5 1 0.5 0.5 2.5 Place Utilities Cut to Grade Lime Treatment Form and Pour Road Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road TOTAL Construction Time East Bound 0.25 0.5 1 0.5 0.5 TOTAL 2.75 WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK Sta. 28+00 to 37+50 will have divided construction. East bound lanes reconstructed first Construction Time West Bound 1 0.5 1 2.5 Cut to Grade Lime Treatment Form and Pour Road Install Traffic Control Cut to Grade Lime Treatment Form and Pour Road TOTAL Construction Time East Bound 0.25 1 0.5 1 TOTAL 2.75 WeeK WeeK WeeK WeeK WeeK WeeK WeeK Sta.37+50 to 47+00 will not have divided construction. Complete Shut down of roadway. Construction Time With Bridge and Retaining Wall Install Traffic Control 0.25 WeeK Demolition 1 WeeK Foundation 2 WeeK Forming 2 WeeK Concrete Cure 4 WeeK Finish Road & Railings 1 WeeK TOTAL 10.25 8ta. 47+00 to 53+60 will have divided construction. West bound lanes reconstructed first Construction Time West Bound 0.25 0.5 1 0.5 1 TOTAL 3.25 Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road Install Traffic Control Place Utilities Cut to Grade Lime Treatment Form and Pour Road Construction Time East Bound 0.25 0.5 1 0.5 1 TOTAL 3.25 South Coppel! 8ta. 1 +25 to 8ta. 5+50 3.75 Weeks 8ta. 5+50 to 8ta. 18+50 south bound 4 Weeks 8ta. 5+50 to 8ta. 18+50 north bound 4.25 Weeks Bethel Road - 8ta. 4+50 to 8ta. 9+75 west bound 3.25 Weeks 8ta. 4+50 to 8ta. 9+75 east bound 3 Weeks 8ta. 9+75 to 8ta. 14+00 3.75 Weeks 8ta. 14+00 to 20+00 west bound 3.75 Weeks 8ta. 14+00 to 20+00 east bound 3.5 Weeks 8ta. 20+00 to 28+00 east bound 3.25 Weeks 8ta. 20+00 to 28+00 west bound 2.5 Weeks 8ta. 28+00 to 37+50 east bound 2.5 Weeks 8ta. 28+00 to 37+50 west bound 2.75 Weeks 8ta. 37+50 to 47+00 10.25 Weeks 8ta. 47+00 to 53+60 east bound 3.25 Weeks 8ta. 47+00 to 53+60 west bound 3.25 Weeks Total Total 57 Weeks 399 Da s WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK WeeK