Loading...
Vistas of C P3-LR 990506 (2)FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: May 6, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: April 7, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors 6094694 CONCRETE SUPPLIER: Lattimore 70 PLANT/TRUCK: 6/802 78 MIX ID NUMBER: 42 9:45 AIR ( %) (ASTM C -231) : LOAD 9:00 WATER ADDED (gal): 0 Sunny SLUMP (in.) (ASTM C -143) : 4 Park Highlands Court, sampled at station 1 +60 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 11 , 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 61 7 04114/99 126000 4460 3600/28 days VOC 62 28 05/05/99 145000 5130 VOC 63 28 05/05/99 148000 5240 VO 64 Hold Fracture mode is (A) unless otherwise noted Specifications: Cu king ASTM C -31 ® ® Methods: ASTM C -39 Fractu of A B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. Reviewed By: SMH /em Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis j FUGRO SOUTH, INC. �SRO ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date May 6, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: April 7, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors 6094720 CONCRETE SUPPLIER: Lattimore 74 PLANT/TRUCK: 6/963 79 MIX ID NUMBER: 42 11:05 AIR ( %) (ASTM C -231) : LOAD 12:00 WATER ADDED (gal): 0 Overcast SLUMP (in .) (ASTM C -143) : 5 Springhill Drive, sampled at station 8 +40 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER ( days) TESTED (pounds) (psi) (psi) VOC 65 7 04/14/99 94000 3330 3600/28 days VOC 66 28 05/05/99 114000 1 4030 VOC 67 28 05/05/99 116000 4100 VOC 68 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. Reviewed By: SM H /em Distribution: Centex Homes - Robert Poole City of Coppell -Larry Davis J FUGRO SOUTH, INC. �GiRO ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301: Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date May 6, 1999 PROJECT Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: April 6, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contracting Company 7068639 CONCRETE SUPPLIER: Lattimore 84 PLANT/TRUCK: 7/786 75 MIX ID NUMBER: 42 2:46 AIR ( %) (ASTM C -231) : 4.8 3:43 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 3 Pavement of alley between Springhill Drive and Natches Trace CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 53 7 04/13/99 107000 3780 3600/28 days VOC 54 28 05/04/99 127000 4490 VOC 55 28 05/04/99 125000 4420 VOC 56 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, ASTM C Types of Fracture: U E z Curing: Methods: -39 A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /em Distribution: Centex Homes - Robert Pool City of Coppell - Larry Davis May-13-99 03-01P P.02 ,) iviTi.'tJ y linu) 14 4U VLAILA nVI•,UO FUGRO SOUTH, INC. 2180 Virgo LWw; Oalas, Toms ISM Ph (972) 4944m; Fax (572) w -772 MELD DENSITY REPORT CLIENT: Centex Homes REPORT DATE: May G. 1999 PROJECT: Daycare Center. Coppall PROJECT NO.: 0791 -2120 Page 1 Dsnslty Test Matl+od ASTM A-2W a 3017 MMod of CoMpaction: AMM 04NN MOISTURMENSITY RELATIONS Material Proctor Results Number Desorlpdon Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Mediurn brown clay 94.4 25.1 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY WEIGHT MOIS1e'l1RE Panc NT OF COKMNT PMIRCENT MAXIMUM DENSITY NO. NO. 1 1 Channel bacdll at 100 feet west Of 93.4 27.1 96.9 northwest Comer of building, 1 st lilt 2 1 Channel becldill at 90 feet west of 91.0 30.5 96.4 northwest comer of building, 2nd In 3 1 Channal backkfill at 75 feet west of 93.7 26.6 99.3 northwest corner of building, 3rd lift 4 1 Channel bacdll at 60 feet west of 92.8 26.0 98.3 northwest comer of building, 4th lift 5 1 _ Channel backnl V 65 fact west of 92.6 29 -8 9 6. 1 northwest Cornier of building, 3th lift $ 1 Channel baokfili at 50 feet west of 94.0 28.2 99.6 northwest comer of building, 6th lift 7 1 Channel backilill at north and of building, 94.9 27.6 100.5 1 st lift 8 1 Channel backflll at 10 feet east of 92.8 27.9 98.3 northwest comer of building, 2nd IA g 1 Charnel backflll at 10 Feet east Of 92.8 26 -4 98.3 northeast comer of building, 3rd ilft 10 t Channel backfill at north end of building, 91.0 30.4 96.4 center, 4th lift