Loading...
Vistas of C P3-LR 990505FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: May 5, 1999 PROJECT Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: April 6, 1999 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contracting Company 7068600 CONCRETE SUPPLIER: Lattimore 76 PLANTITRUCK: 7/802 68 MIX ID NUMBER: 438 10:40 AIR ( % ) (ASTM C -231) : 4.3 11:10 WATER ADDED (gal): 20 Sunny /clear SLUMP (in.) (ASTM C -143) : 4 Pavement on Springhill Drive at station 4 +89 VOC 49 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER NUMBER AGE (days) DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (psi) VOC 49 7 04/13/99 113000 4000 3000/28 days VOC 50 28 05/04/99 142000 5020 VOC 51 28 05/04199 140000 4950 VOC 52 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C -39 Types of Fracture: A® B C Z D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: �-- SMH /rm Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis