COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: April 27, 1999
PROJECT: Vistas of Coppell 3, Coppell, Texas Project NO.: 0781 -2276
I SAMPLE DATE: April 16, 1999 I
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Site Concrete
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK:
MIX ID NUMBER:
AIR ( %) ( ASTM C -231)
WATER ADDED (gal):
SLUMP (in.) (ASTM C -143) :
Pavement: inlet tops on Park Highland Drive, station 7 +25
REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed
to be correct.
Technician: Frank Daniel
FUGRO SOUTH INC.
Reviewed By: '-
SMH /mv
Distribution: Centex Homes - Robert Poole
City of Coppell - Larry Davis
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
SPECIFIED COMPRESSIVE
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
LOAD
(pounds)
STRENGTH
(psi)
STRENGTH
(psi)
VOC 81
7
4 -23 -99
149000
5270
3000128 days
VOC 82
28
5 -14 -99
VOC 83
28
5 -14 -99
VOC 84
Hold
Specifications:
Making &
Curing:
ASTM C -31
Testing ASTM C -143,
Methods: ASTM C-39
Fracture mode is (A) unless otherwise noted
Types of
Fracture: A ® BE CZ D
REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed
to be correct.
Technician: Frank Daniel
FUGRO SOUTH INC.
Reviewed By: '-
SMH /mv
Distribution: Centex Homes - Robert Poole