Loading...
Vistas of C P3-LR 990409FUGRO SOUTH, INC. ORO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 9, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: April 1, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors, Inc. 14091638 CONCRETE SUPPLIER: Lattimore 68 PLANT/TRUCK: 14/622 65 MIX ID NUMBER: 438 2:24 AIR ( %) (ASTM C -231) : 4.1 3:30 WATER ADDED (gal): 0 Cloudy SLUMP (in.) (ASTM C -143) : 3 Pavement on Lyndsie Drive at station 6 +75 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 127, 28127 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) VOC 41 7 04/08/99 112000 3960 3000/28 days VOC 42 28 04/29/99 VOC 43 28 04/29/99 VOC 44 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Curing: Testing ASTM C -143, Types of Methods: ASTM C -39 Fracture: A® B® C Z D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis ' FUGRO SOUTH, INC. a 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 9, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project NO.: 0781 -2276 SAMPLE DATE: April 1, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors, Inc. 7068334 CONCRETE SUPPLIER: Lattimore 70 PLANT/TRUCK: 7/785 69 MIX ID NUMBER: 438 12:01 AIR (%) (ASTM C -231) : 4.5 12:37 WATER ADDED (gal): 10 Cloudy SLUMP (in.) (ASTM C -143) : 4.50 Pavement on Lyndsie Drive VOC 37 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard V x 112" 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 37 7 04/08/99 114000 4030 3000/28 days VOC 38 28 04/29/99 VOC 39 28 04/29/99 VOC 40 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A U B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /m1 Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis FUGRO SOUTH, INC. am 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes PROJECT: Vistas of Coppell 3, Coppell, Texas Report Date: April 9, 1999 Project No.: 0781 -2276 SAMPLE DATE: April 1, 1999" CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (AsTM C- 1o64): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors, Inc. 7068298 CONCRETE SUPPLIER: Lattimore 64 PLANT/TRUCK: 7/959 66 MIX ID NUMBER: 438 8:01 AIR ( %) (ASTM C -231) : 4.2 8:45 WATER ADDED (gal): 10 Cloudy SLUMP (in.) (ASTM c -143) : 3 Pavement on Lyndsie Drive at station 13 +50 VOC 33 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 " x 12",:28.27 °square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 33 7 04/08/99 117000 4140 3000/28 days VOC 34 28 04/29/99 VOC 35 28 04/29/99 VOC 36 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of z Curing: Methods: ASTM C -39 Fracture: A n B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /rrn Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis FUGRO SOUTH, INC. Goo 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 9, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DINE: March 31, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (AsTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors 6094111 CONCRETE SUPPLIER: Lattimore 60 PLANTITRUCK: 6/617 65 MIX ID NUMBER: 438 11:56 AIR ( %.) (ASTM C -231) : 4.2 1:00 WATER ADDED (gal): 20 Cloudy SLUMP (in.) (ASTM C-143): 3 Pavement on alley between Park Highland Drive and Springhill Drive, station 5 +40 7 04/07/99 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 "`x 1r, 28.27 square: inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 29 7 04/07/99 125000 4420 3000/28 days VOC 30 28 04/28/99 VOC 31 28 04/28/99 VOC 32 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of [L Curing: Methods: ASTM C -39 Fracture: A® BE C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: _ SMH /rrn Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis FUGRO SOUTH, INC. ORO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 9, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: March 31, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM c- 1o64): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors 6094080 CONCRETE SUPPLIER: Lattimore 58 PLANTI TRUCK: 6/963 65 MIX ID NUMBER: 438 8:33 AIR ( %) (ASTM C -231) : 4.1 9:30 WATER ADDED (gal): 0 Cloudy SLUMP (in.) (ASTM C -143) : 3 Pavement on Park Highland Drive, station 5 +00 VOC 25 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 " "x 12 11 , 28.27 square inches: TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 25 7 04/07/99 138000 4880 3000/28 days VOC 26 28 04/28/99 VOC 27 28 04/28/99 VOC 28 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of z Curing: Methods: ASTM C -39 Fracture: A U B® C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /m1 Distribution: Centex Homes - Robert Poole City of Coppell - Lary Davis emu FUGRO SOUTH, INC. 2880 Virgo Lane: Dallas, Texas 75229 Ph(972)484 -8301: Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 9, 1999 PROJECT: Vistas of Coppell 3, Coppell, Texas Project No.: 0781 -2276 SAMPLE DATE: March 31, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM c4064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Gilco Contractors, Inc. 6094063 CONCRETE SUPPLIER: 54 PLANTITRUCK: 60 MIX ID NUMBER: 6:41 AIR ( %) (ASTM C -231) : 7:30 WATER ADDED (gal): Cloudy SLUMP (in.) (ASTM C -143) : Pavement on Park Highland Drive, station 6 +71.70 Lattimore Materials 6/808 438 4 0 31/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 " °x 12 ", 26.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) VOC 21 7 04/07199 124000 4390 3000/28 days VOC 22 28 04/28/99 VOC 23 28 04/28/99 VOC 24 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: I Methods: ASTM C -39 Fracture: A n B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: SMH /m1 Distribution: Centex Homes - Robert Poole City of Coppell - Larry Davis