Loading...
DR8902-CS 881227 Coppell, Texas 75019 December 27, 1988 Mr. D. W. D. Bain 721 Bethel School Road Coppell, Texas 75019 Dear Mr. Bain: North Lake Woodlands Phase 6 Bethel School Road and Pelican Drainage Problems In response to our discussion at the Council meeting of December 13, 1988 and your letter dated December 14, 1988, please be advised of the following scheduling on the engineering evaluation funded by the City Council. Originally, we indicated that the schedule would take 4-6 weeks for the approved initial engineering review and due to the holidays, etc. we anticipate being able to meet the 6 week timing. That is, we will look toward to meeting with you and the Consultant, as well as any other homeowner(s), who care to attend during the week of January 23. The work could possibly get done earlier than that, and if so, we will schedule an earlier meeting. This initial engineering review is a part of the total public improvement process that consists of: Phase I Preliminary Engineering Review and Recommended improvements with estimated costs; Phase II Final Engineering Desi§n and Construction document development; Phase III Construction of the Improvement continued .... /2 Phase I will provide us the options/solutions available for Phase II and III. As we discussed, Phase II and III may entail only minor improvements that could be done by City or county forces; or more complex work that would need to be done by contractors with engineering design drawings and specifications. The time for City/County work would be the time it takes for ordering materials and scheduling the work. Conceivable 1-2 months given adequate weather conditions. In order to contract for improvements the following timing would be anticipated: o Contact documents development 3-4 weeks o Advertise 3-4 weeks o Start up and construction 2-4 weeks Total 8-12 weeks. Combining the 8-12 weeks with the 4-6 weeks for the initial study provides us a possible outside timetable of 2-3 months with good weather conditions. I hope this information suffices in satisfying your request for a schedule of events. Please let me know if you need any other information. Sincerely,~ / / , Steve Goram, Director of Public Works Shohree Daneshmand, Civil Engineer Kevin Peiffer, Ginn Inc. Mr. T. Guidry, 771 Pelican RRD:kg BAINLTR