Lost Creek TH-CS061130 (2)DEVELOPMENT FEE TABLE
Project: Coppell Commons
Date: 11/30/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $43,200.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $2,400.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $985.92
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $227.52
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,170.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $270.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $35,100.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $1,950.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,950.00
(100% due at Issuance of Building Permit)
Park Fee $50,115.00 $50,115.00
(100% due prior to Filing Plat)
Roadway Impact Fee $24,804.00 $24,804.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Avai lable
(100% due prior to Start of Construction)
TOTAL $162,172.44
TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $74,919.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Commons
DATE: 11/30/2006
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
39 - 5/8 inch X 3/4 inch
9 - 5/8 inch X 3/4 inch
0
0
Total #: 48 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
= 39 ESU's
= 9 ESU's
= 0 ESU's
= 0 ESU's
Water Tap Inspection Fee:
Total #: 48 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 39 Domestic Meter(s) @ $25.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 9 Irrigation Meter(s) @ $25.28
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 39 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 9 Meter(s) @ $30.00 ea.
(100°/a due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 39 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 39 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 39 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$43,200.00
$2,400.00
$985.92
$227.52
$0.00
$0.00
$1,170.00
$270.00
$35,100.00
$1, 950.00
$1,950.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone
39 Single-family @ $1,285.00 per lot
0 Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Zone 2
$50,115.00
$0.00
$24,804.00
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Coppell Commons
DATE: 11/30/2006
ROADWAY IMPACT FEE:
Service Area * 1
Cate ory ** Residential
Land Use ** Residential Medium/Low
No. Lots/Units 39
Development Units ** 39.00
Vehicle Miles er Develo ment Unit ** 4.24
Fee er Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $24,804.00
* (Figure 4.1 -Roadway Impact Fee Study)
** (Table 4.10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)