Loading...
Lost Creek TH-CS061130 (2)DEVELOPMENT FEE TABLE Project: Coppell Commons Date: 11/30/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $43,200.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $2,400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $985.92 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $227.52 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,170.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $270.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $35,100.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $1,950.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $1,950.00 (100% due at Issuance of Building Permit) Park Fee $50,115.00 $50,115.00 (100% due prior to Filing Plat) Roadway Impact Fee $24,804.00 $24,804.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Avai lable (100% due prior to Start of Construction) TOTAL $162,172.44 TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $74,919.00 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Commons DATE: 11/30/2006 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 39 - 5/8 inch X 3/4 inch 9 - 5/8 inch X 3/4 inch 0 0 Total #: 48 ESU's @ $900.00 ea. (Due prior to issuance of building permit) = 39 ESU's = 9 ESU's = 0 ESU's = 0 ESU's Water Tap Inspection Fee: Total #: 48 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 39 Domestic Meter(s) @ $25.28 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 9 Irrigation Meter(s) @ $25.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 39 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 9 Meter(s) @ $30.00 ea. (100°/a due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 39 @ $900.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 39 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 39 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $43,200.00 $2,400.00 $985.92 $227.52 $0.00 $0.00 $1,170.00 $270.00 $35,100.00 $1, 950.00 $1,950.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone 39 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Zone 2 $50,115.00 $0.00 $24,804.00 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Coppell Commons DATE: 11/30/2006 ROADWAY IMPACT FEE: Service Area * 1 Cate ory ** Residential Land Use ** Residential Medium/Low No. Lots/Units 39 Development Units ** 39.00 Vehicle Miles er Develo ment Unit ** 4.24 Fee er Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $24,804.00 * (Figure 4.1 -Roadway Impact Fee Study) ** (Table 4.10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule)