Loading...
Gateway BP(3.1)-CS061130 (2)DEVELOPMENT FEE TABLE Project: Gateway Busiuess Park No. 3 Date: II/30/2006 ~R,Ec.t nit I Nflfl~' TOTAL AMOUNT UE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $21,438.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $408.68 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $9,491.18 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $9,594.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $60,427.33 $60,427.33 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $102,039.19 TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $60,427.33 DEVELOPMENT FEE WORKSHEET PROJECT: Gateway Business Park No. 3 DATE: 11/30/2006 Water Impact Fee: Domestic Meter(s): Irrigation Meters}: Fireline Meter(s): 2 - 2 inch 2 - 2 inch 0 2 - 8 inch Total #: 23.82 ESU's @ $900.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: = 10.66 ESU's = 10.66 ESU's = 0 ESU's = 2.5 ESU's Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: $21,438.00 $300.00 $408.68 Total #: 2 Irrigation Meter(s) @ $204.34 $408.68 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $4,541.25 $9,082.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 10.66 @ $900.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $60.00 $120.00 $9,594.00 $100.00 $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0.00 $0.00 $60,427.33 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Gateway Business Park No. 3 DATE: 11/30/2006 ROADWAY IMPACT FEE: Service Area * 1 Cate o ** Office Land Use ** General Office Buildin Buildin Area (sf) 225,370 Develo ment Units ** 225.37 Vehicle Miles er Develo ment Unit ** 7.15 Fee er Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $241,709.33 * (Figure 4.1 -Roadway Impact Fee Study) ** (Table 4.10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) check credit from gateway street construction Percent of Credit Toward Roadway Impact Fees 75% ~/,/~~T Tyoyt~aTl Credit $1C8 /1~,28+1y.+9~9