Gateway BP(3.1)-CS061130 (2)DEVELOPMENT FEE TABLE
Project: Gateway Busiuess Park No. 3
Date: II/30/2006
~R,Ec.t nit I Nflfl~'
TOTAL AMOUNT UE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $21,438.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $408.68
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $9,491.18
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $120.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $9,594.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $60,427.33 $60,427.33
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $102,039.19
TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $60,427.33
DEVELOPMENT FEE WORKSHEET
PROJECT: Gateway Business Park No. 3
DATE: 11/30/2006
Water Impact Fee:
Domestic Meter(s):
Irrigation Meters}:
Fireline Meter(s):
2 - 2 inch
2 - 2 inch
0
2 - 8 inch
Total #: 23.82 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
= 10.66 ESU's
= 10.66 ESU's
= 0 ESU's
= 2.5 ESU's
Total #: 6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 2 Domestic Meter(s) @ $204.34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
$21,438.00
$300.00
$408.68
Total #: 2 Irrigation Meter(s) @ $204.34 $408.68
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 2 Fireline Meter(s) @ $4,541.25 $9,082.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 10.66 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$60.00
$120.00
$9,594.00
$100.00
$100.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved:
0 Single-family @ $0.00 per lot
0 Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0.00
$0.00
$60,427.33
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Gateway Business Park No. 3
DATE: 11/30/2006
ROADWAY IMPACT FEE:
Service Area * 1
Cate o ** Office
Land Use ** General Office Buildin
Buildin Area (sf) 225,370
Develo ment Units ** 225.37
Vehicle Miles er Develo ment Unit ** 7.15
Fee er Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $241,709.33
* (Figure 4.1 -Roadway Impact Fee Study)
** (Table 4.10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)
check credit from gateway street construction
Percent of Credit Toward Roadway Impact Fees 75%
~/,/~~T Tyoyt~aTl Credit $1C8 /1~,28+1y.+9~9