Loading...
Lauth Park-CS061130 (2)DEVELOPMENT FEE TABLE Project: Lauth - Coppell Date: 11/30/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $8,550.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $62.74 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $9,286.84 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,503.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $183,109.65 $183,109.65 (100% due prior to Filing Plat) Street Light Fee Information not Avai lable (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $202,932.23 TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $183,109.65 DEVELOPMENT FEE WORKSHEET PROJECT: Lauth - Coppell DATE: 11/30/2006 Water Impact Fee: Domestic Meter(s) Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch 1 - 2 inch 0 2 - 8 inch Total #: 9.5 ESU's @ $900.00 ea. (Due prior to issuance of building permit} = 1.67 ESU's = 5.33 ESU's = 0 ESU's = 2.5 ESU's Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $62.74 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: $8,550.00 $200.00 $62.74 Total #: 1 Irrigation Meter(s) @ $204.34 $204.34 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $4,541.25 $9,082.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 1.67 (Due prior to issuance of building permit) @ $900.00 ea Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $30.00 $90.00 $1,503.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0.00 $0.00 $183,109.65 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Lauth - Coppell DATE: II/30/2006 ROADWAY IMPACT FEE: Service Area * 1 Cate ory ** Office Land Use ** MedicaUDental Office Buildin Area (sf) 68,350 Develo ment Units ** 68.35 Vehicle Miles er Develo ment Unit ** 17.86 Fee er Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $183,109.65 * (Figure 4.1 -Roadway Impact Fee Study) ** (Table 4.10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) check credit from old beal property