Shake & Shingle-CS061130 (2)DEVELOPMENT FEE TABLE
Project: Shake and Shingle
Date: 11/30/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $13,059.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $350.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $250.96
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $9,286.84
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $120.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $6,012.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $27,945.96 $27,945.96
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $57,514.76
TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $27,945.96
DEVELOPMENT FEE WORKSHEET
PROJECT: Shake and Shingle
DATE: 11/30/2006
Water Impact Fee:
Domestic Meter(s)
Irrigation Meter(s):
Fireline Meter(s):
4 - 1 inch
1 - 2 inch
0
2 - 8 inch
Total #: 14.51 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
= 6.68 ESU's
= 5.33 ESU's
= 0 ESU's
= 2.5 ESU's
Water Tap Inspection Fee:
Total #: 7 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
$13,059.00
$350.00
Total #: 4 Domestic Meter(s) @ $62.74 $250.96
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $204.34 $204.34
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 2 Fireline Meter(s) @ $4,541.25 $9,082.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 6.68
(Due prior to issuance of building permit)
$120.00
$90.00
@ $900.00 ea
Wastewater Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 4 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$6,012.00
$200.00
$200.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved:
0 Single-family @ $0.00 per lot
0 Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0.00
$0.00
$27,945.96
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Shake and Shingle
DATE: 11/30/2006
ROADWAY IMPACT FEE:
Service Area * 1
Cate ory ** Li ht Industrial
Land Use ** General Li t Industrial
Buildin Area (s~ 57,680
Development Units ** 57.68
Vehicle Miles er Develo ment Unit ** 3.23
Fee er Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $27,945.96
* (Figure 4.1 -Roadway Impact Fee Study)
** (Table 4.10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)