Loading...
Belt Line Trade-LR070115 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS -~~~~~-------- CONCRETE DER TEST REPORT Belt . e Trade Center Building A 356 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 177 REG PROJECT NO. 13335 SAMPLE DATE: 12-18-06 TECHNICIAN: R. Hollings PAGE: 1 of 1 CONTRACTOR: Raymond Construction Location of Sam Set Number 1 . corner Mix Identification 1551 ecified Stren th 4000 Date Tested 12-25-06 01-15-07 01-15-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 85350 115910 120430 4180 C linder Data Set Cylinder No. ID 1 9649 Air Entrainment 4.8 Ticket Number 6296538 Mail Distribution: Submitted by: (1) IDI/Mr. Chris Parnell (1) Raymond Constructionl REED ENGINEERING GROUP, LTD. Mr. David Layne (1) City of Coppell/Mr. Larry Davis Original Signed By (1) City of Coppell/Mr. Lee stonet . fii Mickey Lawson r 0 Assistant Manager, CMT ~ "{ MLllnc /'2. 'L'~~7 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . FAX [214] 3500019