Loading...
PA9901-LR061120LAWRENCE ENGINEERING _ ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite 8 Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 Concrete Compression Test Report Client: City of Coppell Report Distribution: (1) Larry Davis - City of Coppell Project: Wagon Wheel Park (1) John Elias - Parks Dept. Parking Lot Improvements LE Report No.: C06- 0903 -019 Report Date: 11/20/2006 Strength Slump Air Content Concrete Temperature Ambient Temp erature 3000 psi @ 28 Days 3 in min 5 in max 3 % min 6 %max 95° F max n/a Placement Date Sampled By Weather Supplier /Mix Air Content Method Tes D ata 11/15/2006 Prabin Shilpakar Cool/Windy Lattimore Materials /1261 ASTM C -231 -B - - � '' �....._.. 'K" �- "� sass. rr,�1,u'�_v�v:s� • - �� A Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 3223 1 n/a n/a Light pole base at P2 ime Batched: I ime amp e Air Content: n/a Unit Weight: Ambient Temperature: n/a Yardage (c.y.): C y linder Age Set # # Test Date (days) Max Load (lbs. force) Area (sq.in.) Strength (psq Fracture Type 1 WWP11150601 12/13/2006 28 148040 28.27 5240 unbonded cap 1 WWP11150602 12/13/2006 28 149960 28.27 5300 unbonded cap 28 day average 5270 Normal cylinder size: 6" x 12" Field and laboratory tests by LE are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. Concrete was placed early, prior to the scheduled arrival of field technician. Contractor retained a sample and field technician cast 2 - 28 day compressive strength test from sample upon arrival at the site. Not enough concrete retained to perform slump or air test prior to casting cylinders. LAWRENCE ENGINEERING Gary D. Dry Construction Materials Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of LE. 0 Page I of I