Loading...
DR8902-CS 881107 (2) COPPELL PUBLIC ~ORKS NENORANDIJN November 7, 1988 TO: Russell Doyle, City Engineer FROM: Steve Goram, Director of Public W RE: Pelican @ Bethel School Drainage As to our opinion concerning lot drainage, Inspections is primarily responsible for grading, elevations of streets, right-of-ways, alleys, and easements. The private property drainage would be the responsibility of the home builder, not the City unless it is within the floodplain. This is my understanding as it was conveyed to me by the former City Engineer, our Consulting Engineer, and our Chief Public Works Inspector. Furthermore, the project was not inspected by the Chief Public Works Inspector, Steve Morton. It is my understanding that this project was inspected by Ginn, Inc.. (You may wish to contact Wayne to verify this). In regard to construction control and my role as it relates to this, Steve Morton is the Department Head responsible for developmental construction that is private or semi-private. He began this work October 13, 1986. He was transferred to Public Works July 11, 1987 from Engineering and works within parameters under my supervision at present. It is my understanding and that of the Chief Public Works Inspector that lot grading is not part of his inspections. It has never been the practice of the Engineering Department, Public Works Department, or our Consultant's to perform the grading inspection on individual lots at time of the infastructure acceptance. If you have any other questions, feel free to contact me. SGG/sm cc: Alan Ratliff, City Manager Steve Morton, Chief Public Works Inspector Dale Jackson, Chief Building Official