Loading...
WA9403-CS 940503 EXHIBIT A HOURLY RATES FOR ADDITIONAL SERVICES The following hourly rates will apply to services as outlined in paragraph 1.2.2 of the Standard Professional Services Agreement Between Owner and Engineer. These rates will remain in effect until they are increased or decreased in accordance with paragraph 1.2.2.4. Principal $110.00 Project Manager 85.00 Senior Engineer 80.00 Senior Architect 80.00 Engineer 65.00 Architect 65.00 Designer 55.00 Technician 48.00 Draftsman 40.00 Clerical 35.00 Survey Party (3-man) 150.00 Computer Usage 25.00 EXHIBIT B SCOPE OF SERVICES WATER AND SEWER CAPITAL IMPROVEMENT PROGRAM FOR IMPACT FEE UPDATE A. WATER SYSTEM MASTER PLAN Data Collection: Water System and Water Demands - Rady & Associates shall perform the following data collection with the assistance of the City staff. Previous information provided by the City for the existing water distribution system analysis associated with the reconstruction of Sandy Lake Read (R&A No. 93021.00) will be utilized. 1. Review information provided by the City regarding population and land use (current and future projections) for the city and any customers outside the city limits. An Existing and Future Land Use Map adopted by the City is required in order to comply with the Impact Fees law. 2. City shall provide a representative sampling of meter books to determine typical water demand per type of connection. System Analysis - Rady & Associates shall perform an analysis of the existing and future (10 and 20 year) water system to determine existing system deficiencies, proposed system improvements, future system improvements, and expected system operational criteria as follows: 1. The evaluation of the existing system shall include: a. Evaluate supply sources and water system components, (i.e., elevated tanks, ground storage tanks, pumps, and transmission lines) as compared to Tens Natural Resource Conservation Commission Rules and Regulations (TNRCC), insurance industry standards, and specific system demands using present maximum day demands and an extended period simulation which includes maximum hour and fire flows superimposed on maximum day avenge hour demands. b. Determine system deficiencies and potential remedial solutions to correct immediate problems. 2. Evaluate future conditions and system improvements needed to serve the projected (20) year population and system extensions utilizing the above criteria for the same. This evaluation shall include the distribution of the supply from Dallas Water Utilities. 3. Incorporate future requirements into recommended improvements to the present system and develop an overall system improvement plan that is compatible with both present and future system requirements. 4. Evaluate future conditions and system improvements needed to serve the projected 10-year population and system extensions utilizing the same criteria as above. This evaluation is made for computations of Water Impact Fees. 5. Prepare cost projections and exhibits illustrating the recommended course of action. Report - Based upon the above system analysis, Rady & Associates shall present the findings and recommendations as follows: 1. Prepare a draft report outlining the evaluation, recommendations, and selected improvement plans for review by the city staff. The report shall include a written narrative of our findings and exhibits. 2. Rady & Associates anticipates attending two (2) meetings with staff to discuss data input, analysis, recommendations and incorporation of appropriate comments into the final report. Rady & Associates shall attend one (1) meeting with the Mayor and Council to present the final report if deemed appropriate by the City staff. B. WASTEWATER SYSTEM MASTER PLAN Data Collection - Rady & Associates shall perform the following data collection with the assistance of the City staff regarding the existing wastewater collection system: 1. Review information provided by the City regarding location, type, age and size of existing wastewater collection network; 2. Review information provided by the City regarding location and size of lift stations and pumps, including head discharge relationship (pump curves), and any instrumentation/operation parameters; 3. Review information provided by the City regarding locations and capacities of outfall sewers, (i.e., City of Dallas and other entity lines); 4. Review information provided by the City regarding population, number of connections and land use (current and future projections) for the service area; and, 5. Review information provided by the City on historical wastewater flows measured at metering stations or lift stations, with water usage for the same period. Development of Data Base Model - Rady & Associates shall compile the above information and create a data base model of the City's wastewater collection system by performing the following tasks: 1. Prepare a data base model for the City system based upon the physical wastewater system components including lines, lift stations and force mains; expected flows based upon the system, historical wastewater flows and land use; and current wastewater system operational conditions; and, 2. Verify the model against the City's actual operational experiences and review any unexpected results with the City staff. System Analysis - Rady & Associates shall perform an analysis of the existing and future (10 and 20 year) wastewater collection system to determine existing system deficiencies, proposed system improvements, future system requirements, and expected system operational criteria as follows: 1. The evaluation of the existing system shall include: a. Evaluate capacities of existing outfall sewers, collectors, lift stations and force mains and specific system requirements using TNRCC Rules and Regulations using present day flows and peaking factors; b. Determine system deficiencies and potential remedial solutions to correct immediate problems. 2. Evaluate future conditions and system improvements needed to serve the projected 20-year population and system extensions utilizing the above criteria for the same. 3. Incorporate future requirements into recommended improvements to the present system and develop an overall system improvement plan that is compatible with both present and future system requirements. 4. Evaluate future conditions and system improvements needed to serve the projected 10-year population and system extensions utilizing the same criteria as above. This evaluation is made for computations of Sanitary Sewer Impact Fees. 5. Prepare cost projections and exhibits illustrating the recommended course of action. The engineer's cost projection shall be based upon the most recently available cost dan for projects of similar nature and the professional judgment of the Engineer. Cost for right-of-way and easements shall be based on information provided by City staff of recent property acquisitions. Report - Based upon the above analysis, Rady & Associates shall present the findings and recommendations as follows: 1. Prepare a draft report outlining the evaluation, recommendations, and selected improvement plans for review by the City staff. The report shall include a narrative of our findings and exhibits; 2. Rady & Associates anticipates attending three (3) meetings with staff to discuss data collection, input, analysis, recommendations and incorporation of appropriate comments into the final report. Rady & Associates shall attend one (1) meeting with the Mayor and Council to present the final report if .deemed appropriate by the City staff. ~I C. CAPITAL IMPROVEMF2qTS PLAN A Capital Improvements Plan (CIP) for both water and wastewater system improvements will be developed based on the approved land use assumptions and population projections together with the results of the Water System Study and Wastewater Master Plan. This plan must provide for construction to commence within two years and to have service available within five years. The CIP will contain specific enumeration of the following items: 1. A description of the existing capital improvements within the service area and the costs to upgrade, update, improve, expand, or replace the system components to meet existing needs and usage and stricter safety, efficiency, environmental, and/or regulatory standards. 2. An analysis of the total capacity, the level of current usage, and commitments for usage of capacity of the existing capital improvements. 3. A description of all or parts of the capital improvements or facility expansions and their costs necessitated by and attributable to new development in the service area based on the approved land use assumptions. 4. A definitive table establishing the specific level or quantity of use, consumption, generation, or discharge of a service unit for each category of capital improvements or facility expansions and an equivalency or conversion table establishing the ratio of a service unit to various types of land uses, including residential, commercial, and industrial. 5. The total number of projected service units necessitated by and attributable to new development within the service area based on the approved land use assumptions and calculated in accordance with generally accepted engineering or planning criteria. 6. The projected demand for capital improvements or facility expansions required by new service units projected over a reasonable period of time, not to exceed 10 years. 7. Rady & Associates anticipates attending two (2) meetings with staff to determine the City's needs and desires in development of a Capital Improvements Program. Rady shall attend one (1) meeting with the Mayor and Council to present the final report if deemed appropriate by the City staff. D. IMPAft FEES UPDATE Impact fees will be updated based on the cost developed for the CIP and the service units established by the approved land use assumptions. The following steps will be performed: 1. Calculate adjustments to fees already collected to reflect the actual cost of constructed facilities. If the adjusted fee is less than 90 % of the collected fee, the entire difference should be refunded; 2. Calculate new impact fees for water and sewer facilities and submit final report to staff for final review. E. PRESENTATIONS AND PUBLIC FORUMS Rady & Associates shall present findings at two (2) Public Hearings specifically scheduled for the consolidated adoption of the Capital Improvements Plan and Impact Fees. E CITY REVIEW~ Upon completion of each part (Water, Wastewater, CIP and Impact Fees), the Engineer shall present three (3) complete reports to the City staff for review. Upon completion of the final review by the City, one (1) copy shall be returned to the Engineer with comments noted. Each report shall be stamped "Preliminary" and dated by the Engineer. Once the appropriate comments have been incorporated into each report, Rady will submit twenty-five (25) copies of the final report for Water System Master Plan, Wastewater System Master Plan, and the Capital Improvements and Impact Fee Update report. G. CONTRACT TIME Rady & Associates shall perform the above items in a timely manner to meet the City's schedule for approval of Impact Fees by November 1994. A schedule of interim tasks and associated deadlines are illustrated in Exhibit "D" and is based on a start date of June 6, 1994, obtaining the necessary data required to complete the Master Plan studies of water and wastewater, and timely review and approval by staff and Council. EXHIBIT C COMPENSATION TO ENGINEER A. BASIC SERVICES For all services listed in the Scope of Services (except additional services), the City shall pay the Engineer a lump sum fee of $89,500. This fee includes all direct expenses of printing, postage, travel, photographic, telephone and computer usage. B. ADDITIONAL SERVICES 1) Should project scope changes be requested by City, or required to address changed conditions or change in direction previously approved by the City or mandated by changing governmental laws, such services shall be considered additional, and shall be performed on an individual reimbursable basis at our established hou~y rates as referenced as Exhibit "A" in our Professional Services Agreement with the City of Coppell and shown below. It is our understanding that the Land Use Assumptions and Land Use Map for existing conditions, 10- year and 20-year projections is approved and will be provided by the City. 2) Additional Meetings with City Staff - The engineer shall attend a maximum of ten (10) meetings with City Staff as a part of the basic services identified above. Should the City request additional meetings with the Engineer, the Engineer shall be compensated on a per meeting basis at a rate of $500.00 each. Said compensation shall be full payment for the preparation for and attendance at said meetings. 3) Additional Public Meetings - The engineer shall attend a maximum of two (2) public meetings to present the Capital Improvements Plan and the proposed Impact Fees as outlined in the report. Should the City request the attendance by the engineer at additional public meetings, the Engineer shall be compensated on a per meeting basis at the rate of $1000.00 each. Said compensation shall be full payment for preparation for and attendance at said meetings. EXHIBIT D CITY OF COPPELL CIP/IMPACT FEES WATER SYSTEM MASTER PLAN Kickoff 6/6/94 Complete Data Collection 6/13/94 *Develop Population/Flow Projections 6/15/94 Analyze Future Conditions (10 yr., 20 yr.) 7/15/94 Submit Initial Report to City 7/29/94 Perform Impact Fee Project Related Work 8/15/94 Final Report 8/15/94 SEWER SYSTEM MASTER PLAN Complete Data Collection 6/13/94 *Develop Population/Flow Projections 6/15/94 Analyze Existing System 7/15/94 Analyze Future System 8/5/94 Submit Initial Report to City 8/22/94 Perform Impact Fee Project Related Work 9/1/94 Final Report 9/1/94 CI.P. / IMPACT FF.F.S Complete Data Collection 6/22/94 Develop Impact Fees and CIP 9/8/94 Report to City/Begin Public Hearing Process 9/15/94 Public Hearings Complete 11/15/94 May 3, 1994 P:\10000.05\LTRPROP\COPPRSCH.WP