DR8902-CS 881020 Coppell, Texas 75019 ~~ The City With A Beautiful Future 214-462-0022 00T 241988 Mr. David W. Bain 721 E. Bethel School Road CITYM^N^6ER Coppell, Texas 75019 RE: Recommended Engineering Study Related to Storm on July 12, 1988 Dear Mr. Bain: As you requested, in follow-up to my telephone call to you today, I indicated that the consideration for subject study will not be presented to the City Council on Tuesday, October 25, 1988, as I had originally anticipated. This proposal was not a budgeted item, and I must complete an analysis of existing funding to see if there might be available funds; and/or if I can recommend a reprioritization of currently funded projects, possibly making funds available for the study. This work should be done mid to late November. The Engineering Study being recommended will be the Preliminary Phase of the capital improvement process. If funded, the Study would make an analysis of the current public stormwater collection system at your location. Depending upon the results of that study, further recommendations may be made. An example of one of the many possible recommendations, would be to install an auxilliary or relief system. If so, then the estimated costs to design and construct such an improvement would be made. Then we would need to identify available funding and make the recommendation for consideration and approval by the City Council. If approved, we would then select consultant engineers to design the improvement, advertise and award a contract, and supervise the construction of the improvement to completion. I hope this is sufficient for your information and distribution to your neighbors. We will continue to work with you and your neighbors to try to resolve this situation and your concerns. Sincerel~ //City Engineer xc: Alan Ratliff, City Manager Frank Trando, Finance Director Shohre Danes~and, Civil Engineer