Loading...
Coppell Trade 2-LR070102,.... ~~~*, r ._ ' 11440 Reeder Rd. • Dallas, TX 75229 ga~R.G'O OONSULTANTS, zxc. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 12/05/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 373641 AMBIENT TEMP.(°F): 53 CONCRETE TEMP.(°F): 74 TIME BATCHED: 1:46 p.m. TIME SAMPLED: 2:20 p.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving fire lane, CONCRETE SUPPLIER: TXI PLANT/TRUCK: 141 /534 MIX ID NUMBER: 8205 AIR (%): 5.4 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 3 1/2 (ASTM C 143) 50'N by 175'W from NE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 5A 7 12 12 06 103 390 3660 92~ 5B 28 1 2 07 ~ 132.720 4690 117 5C 28 1 2 07 130 520 4620 116 5D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by:_ Gary Moor C.E.T CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com ~~ I~ ~ ~ - _ 11440 Reeder Rd. • Dallas, T_X 7522_9 ~'AR(}O CONSULTANTS, Ixc. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 12/05/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 373491 AMBIENT TEMP.(°F): 48 CONCRETE TEMP.(°F): 71 TIME BATCHED: 12 :13 p.m. TIME SAMPLED: 12:35 p.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving fire lane, CONCRETE SUPPLIER: TxI PLANT/TRUCK: 141 / 510 MIX ID NUMBER: 82 05 AIR (%): 5.4 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 4 (ASTM C 143) 60'N by 130'W from NE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psil28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 4A 7 12 12 06 109 730 3880 97~ 4B 28 1 2 07 140 210 4960 124 4C 28 1 2 07 139 640 4940 124 4D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T CMT Mana er Geotechnical Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com ,... ,...: i r~' FAAt}O QONBULTANTS, INO. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (2l4) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 12/05/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 373265 AMBIENT TEMP.(°F): 42 CONCRETE TEMP.(°F): 68 TIME BATCHED: 10:20 a.m. TIME SAMPLED: 10:49 a.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving fire lane, CONCRETE SUPPLIER: TXI PLANT/TRUCK: 141 / 66 MIX ID NUMBER: 8205 AIR (%): 5 . 3 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 3 1/2 (ASTM C 143) 39'N by 90'W from NE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) CYLINDER NUMBER AGE (Days} DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%} 3A 7 12 12 06 94 410 3340 84~ 3B 28 1 2 07 126 450 4470 112 3C 28 1 2 07 122 830 4340 109 3D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T CMT Manager Geotechnica/ Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com ..;._. ,..... ~.._. ,~, .•~, j 11440 Reeder Rd. • Dallas, TX 75229 _ __ _ __ --- FAR.fFO CONSULTANTS, iNO. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 12/05/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas ~ CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 373116 AMBIENT TEMP.(°F): 34 CONCRETE TEMP.(°F): 63 TIME BATCHED: 8:46 a.m. TIME SAMPLED: 9:10 a.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving fire lane, CONCRETE SUPPLIER: Txz PLANT/TRUCK: 141 / 112 MIX ID NUMBER: 82 05 AIR (%): 5.9 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 4 1/2 (ASTM C 143) 43'N by 55'W from NE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (°/a) 2A 7 12 12 06 104 210 3690 92~ 2B 28 1 2 07 130 700 4620 116 2C 28 1 2 07 133 010 4700 118 2D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specittcations: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: TeChrllClan: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - ,Ion Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Mo e, C.E.T CMT Manager Geotechnica! Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com ;... ,..... i / - 11440 Reeder Rd. • Dallas, TX 75229 FARtiO OONBULTANTB, INC. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 12/05/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 372995 AMBIENT TEMP.(°F): 32 CONCRETE TEMP.(°F): 61 TIME BATCHED: 7:19 a.m. TIME SAMPLED: 8:05 a.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving fire lane, CONCRETE SUPPLIER: Txz PLANT/TRUCK: 141 / 10 8 MIX ID NUMBER: 8205 AIR (%): 6 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 4 1/2 (ASTM C 143) 55'N by 36'W from NE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 pail 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 1A 7 12 12 06 98 520 3480 87~ 1B 28 1 2 07 129 030 4560 114 1 28 1 2 07 128 420 4540 114 1D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial -Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moo e, C.E.T CMT Manager Geotechnical Engineering i Construction Materials Testing ~ Environmental Services www. da/lasfargo. com