Loading...
Coppell Trade 2-LR061212:._.... _.. s ~ i 11440 Reeder Rd. • Dat[as, TX 75229 FL~,GO OONSULTANTS,`INO. Tel. (214} 352-4100 • Fax (214j 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/14/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.:362931 AMBIENT TEMP.(°F): 70 CONCRETE TEMP.(°F): 75 TIYIE BATCHED: 10:30 a.m. TIIAE SAMPLED: 11:21 a.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving-parking lot, CONCRETE SUPPLIER: TXI PLANT/TRUCK:141 / 1115 MIX ID NUMBER: 8205 AIR (%): 4 . 6 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 5 (ASTM C 143) 15'S by 300'W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 2A 7 11 21 06 114 480 4050 135 2B 28 12 12 06 143 500 5080 169 2C ~ 28 12 12 06 141 280 5000 167 2D Hold Cyinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: v xobinson Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell - Larry Davis FARGO CONSULT~4NTS, INC. Checked by: Gary Moo C.E.T CMT Manager Geotechnical Engineering i Construction Materials Testing s Environmental Services www. dallasfargo. com ,.._ FAK30 CONSULTANTS, INC. CONCRETE SUPPLIER: Txz PLANT/TRUCK:141 /68 MIX ID NUMBER: 8205 AIR (%): 4 . 7 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 3 1/2 (ASTM C 143) 40'S by 10'E from SE CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/14/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 362556 ANBIENT TEMP.(°F): 54 CONCRETE TEMP.(°F): 70 TINE BATCHED: 7:19 a.m. TINE SAMPLED: 8:15 a.m. WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: Paving-east approach, building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 1A 7 11 21 06 113 300 4010 134 1B 28 12 12 06 140 480 4970 166 1C 28 12 12 06 143 060 5060 169 1D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods Remarks:. Technician: v Robinson Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis T '/~ A_ 11440 Reeder Rd. • Dallas, TX 7522_9 Tel. (214) 352-4100 • Fax (214) 352-4811 ,~~/ i ~-Z`' FARGO CONSULT NTS, INC. Checked by: Gary Moo C.E.T CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com ' ~ 11440 Reeder Rd. ~ Dallas, Texas 75229 FAR(io CONSVLTANTt3, )(STO._ Tel. 214-352-4100 Pax. 214-352-4811 Puge 1 of Z .REPORT OF FIELD COMPACTION Tested For: Holt Lunsford Commercial Date Performed: 12/12/2006 Project Name: Coppell Trade Center Building D FARGO Project No M06-1165 Coppell, Texas Density: Per ASTM D-2922 Gauge Manufacturer: Humboldt Moisture: Per ASTM D-3017 Gauge Model: HS-SOOlEZ Test Mode: Direct Transmission Probe Depth: 8 inches Moisture-Density Relations Proctor No. Material Description Optimum Moisture(%) Max. Dry Density (pq~ 1 Reddish Brown Sandy Clay 19 106 Field Test Results Test Elevation Location Proctor DryDensity Percent percent No. /Lift No (pct) Moisture Density 68 FG-2' Sanitary sewer at grid line D, 15'W from E end 1 102.6 19.7 gg,g 69 FG-1' Sanitary sewer at grid line D, 15'W from E end 1 101 20 95.3 70 FG Sanitary sewer at grid line D, 15'W from E end 1 104.8 19.4 98.9 71 FG-2' Sanitary sewer at grid line D, 8'W from E end 1 101.8 19.3 96 72 FG-1' Sanitary sewer at grid line D, 8'W from E end 1 101.7 20 95,9 73 FG Sanitary sewer at grid line D, 8'W from E end 1 101.9 21.2 gg,1 74 FG-2' Sanitary sewer at grid line D, 150'W from E end 1 103.2 20.6 97,4 75 FG-1' Sanitary sewer at grid line D, 150'W from E end 1 102.1 19 96.3 76 FG Sanitary sewer at grid line D, 150'W from E end 1 104.8 19.3 gg,g 77 FG-2' Sanitary sewer at grid line D, 200'W from E end 1 101.4 20 95.7 78 FG-1' Sanitary sewer at grid line D, 200'W from E end 1 102.7 23 96.9 79 FG Sanitary sewer at grid fine D, 200'W from E end 1 102.9 22,1 97.1 80 FG-2' Sanitary sewer at grid line D, 270'W from E end 1 104.2 19.9 98 3 81 FG-1' Sanitary sewer at grid line D, 270'W from E end 1 101 22.9 95.3 82 FG Sanitary sewer at grid line D, 270'W from E end 1 102.6 21.2 96.8 83 FG-2' Sanitary sewer at grid tine A, 50'W from E end. 1 104.8 19.1 gg g 84 FG-1' Sanitary sewer at grid line A, 50'W from E end 1 102 20.1 gg 2 1.IM1TATfONS: 'ilris repot[ presents test results (at particular loa[ions noted) based on data obtained from specific samples selected for testing. Fargo Consultants, Inc. assumes no responsibility for variation in quality, performance, feature or conditions bryond its control. addrased and may not be reproduced except in full without the writtett approval of Fargo Consu This report is for the exclusive use of the persons} to whom it is ltants, ]ne. ~j' ' 11440 Reeder Rd. • Dallas, 'T'exas 75229 FABtip CQNBIILTANTS, t~ ~ Tel. 214-352-4100 Fax. 214-352-4811 Page 2 of 2 REPORT OF FIELD COMPACTION Tested For: Holt Lunsford Commercial Date Performed: 12/12/2006 Project Name: Coppell Trade Center Building D FARGO Project No M06-1165 Coppell, Texas Density: Per ASTM D-2922 Gauge Manufacturer: Humboldt Moisture: Per ASTM D-3017 Gauge Model: HS-SOOlEZ Test Mode: Direct Transmission Probe Depth: 8 inches Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No. (pcf) Moisture Density 85 FG Sanitary sewer at grid line A, 100'W from E end 1 103.2 21.3 g7,4 86 FG-3' Sanitary sewer at grid line A, 150'W from E end 1 104.3 22.6 98.4 87 FG-2' Sanitary sewer at grid line A, 150'W from E end 1 102.3 19.4 96.5 88 FG-1' Sanitary sewer at grid line A, 150'W from E end 1 101.9 21.4 96.1 89 FG Sanitary sewer at grid line A, 150'W from E end 1 101.4 21.8 95,7 All tests comply with the project requirements, unless otherwise noted Technician: David Djilcine Reslnectfully Submitted, Distribution: Hoit Lansford Commercial -Ken Newman FllYg'O CO/tSlllt(lntS~ I71C. Mcfadden & Miller -Jon Jacobson City of Coppell -Lee Stone Checked By: LIMITATIONS: This report presents test results (at particular locations noted) based on data obtained from specific samples selected far testing. Fatgo Consultatts, Inc. assumes no responsibility for variation in quality, performance, feature m wndi[ions beyond its control. This report is for the exclusive use of the person(s) to whom it is addressed and may not be reproduced except in full without the written approval of Fargo Consultants, Inc.