Loading...
Gateway BP(1.4)-PT 9606201.1 ..1g)== i Thai e�,,iml F�o. CONSTRUCTION DEVELOPMENT 6 D PERMIT APPLICATION 1. Name of Applicant: f 1 1 L -1-- h 1 L-46 t 1 X 'Nl 1 l Address: 11 9( �t 1i- r1) -0.6.:D i t ---ass TX �z1ij 5, Phone Number: i'4 4 '5 r I C'c 2. Location of Construction (address): DLL 51N 5 1.442- u T ivision eetwn oe g 7' Or: urvey/ struct Location description (attach vicinity reap): Residential 4. Description of Construction Permit requested: Paving Median or Landscaping 54 Sidewalk Water Main pd Drive Approach R.C.P. 04 Excavation Sanitary Sewer Main IS), Fire Lane Flume Bridge Inlet WdtS TT 96. Si Nflf T81 £ZZ'ON OLSE VOE 112____ PTZ t 9NIb33NI9N3 T93dd00 JO AlIO Acreage 3. Type of proposed construction or development: Alteration of a natural waterway drainage course Non-residential Other (describe attach drawing or sketch) Placement of Fill (in right-of-way or on private property) Box Culvert Rip Rap Fill Area Drainage Channel Excavation Slope Protection Retaining Wall )Q Parking Lot Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. 6S :TT 96/81 s�SOS /90 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Poke 2 5. All construction shall follow the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and stamped approved plans. The activity shall be in compliance with Erosion and Sedimentation Ordinance. 6. Applicant shall provide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculation. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. 1-114/1 Z�1 06.4 Amount Paid +f F u, 9 z s o o Date Paid lv 7 NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way not approved by the City Engineer. Immure of Applicant Wd17S T T 96, 81 Nflf Is additional information required? Are other ederal, state or local permits required? PERMIT APPLICATION APPROVED PERMIT APPLICATION DISAPPROVED FOR CITY USE ONLY Z0 7 Date Is the fill area located in an identified flood hazard area? Yes `4g No If yes, then a Floodplain Development Permit is required before any construction can begin. Yes 04, No Yes 0 No Date E06 =ON OLSE 170E 171 2 1 T Z F 9N 1833N 19N3 113dd00 JO AIM 6S T T 96/61/90 Mr. Ken Griffen City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 HILL WILKINSON, INC. General Contractors RE: Haverty's Regional Distribution Center Coppell, Texas Dear Mr. Griffen: June 20, 1996 To the best of our knowledge, the fees submitted to you reflect the expected amounts of the contracts for work awarded to our Subcontractors. We have calculated the Impact Fees for Paving, Utilities, and Earthwork to total $29,064.56, which will be paid by Hill Wilkinson. The remaining $11,925.00 will be paid by Haverty Furniture Companies, Inc.. I have enclosed a copy of the Impact Fee Schedule for your review. Please call me if you have any questions. KW /sbm cc: Michael Martin City of Coppell Dick Johnson Holly Dewar File 9614.007 Sincerely, HILL WILKINSON, INC. yle Ward Project Engineer 11969 Plano Road, Suite 190 Dallas, Texas 75243 -5486 (214) 437 -1600 Fax (214) 437 -6708