Loading...
Verizon-PT 98091709/1G/% x9:37 CITY X COPPEL.L ENGINEERING - 214 243 • PIF i Tr CNN WAR w F.ARIIY GR"ING / EXCAVATION PERMIT IN RWVr OF WAY I FAMWMT ! PWVAIZ P11�P 1Y I �_ I Appmw d p(mis m= be provided Er4MM CoMrnt is TqNYW A letter fmm die Property 0mw1FargirreerlDewe Wr is rcgmred bore permit *jU be ime A Date: Project Name: Permit Issued to: Address: Z 7 Telephome: Rqmewating: General Description of type of work Oro de mpy of QPPvwd pkm) i Location of Work as afim mw regid eid): Com= made with City and/or franchise polity to kKmW e xisting utilities? (e8 hmn prior to a aavadoa) � YE5 NO U any excavation of pavement in street, slicy or sklewalk necesaaty? vl rw orrasi ter aol YES NO L� Revised 5*W U3/16•%98 09:37 CITY OF COPPELL ENGINEERING i 214 243 522? NO. 640 W3 Ewly Grading / Ex .laden Per PfteZ Representatives) of the FranchisaMonwactox must adhere to all cxnsMucdm standards approved by the City of Coppoll. whim' iachrda but is not Binh ed to: Compaction of tz enches and bores, and barricading acmwdmg to Me Texas Manual on Uniform Traffic Control Devices. Areas) affneted must be restored to as pod condition as before the of work Wad ft, drainage, vegetation. erosion Control). Any excavation requiring closing of a aim or alley must be reported to the Police (304- 3600), Tim ( 304 -3500), Street ( 344 - 3546) and Fnginewing Departments (304.3679) prior to closing. i plan / trench saftty playa if a lane or stroet cloom b required. ApphcaM shall indemnify and forever hold harmless against each and every claim, demand or cause of action that may be made or come against it by reason of or if any way adit out of the closure, Meeting, excavating, cutting, tunneling, or other work by the applicat under permit from the City, if such permit is gianted. ]"Cwf a 09/17/98 THU 15:01 FAX 214 985 1383 BECK L - 714 6 0 September 17, 1998 Mr. Earl Cotton Cooper Excavation, Inc. 11127 Shady Trail, Suite 108 Dallas, TX 75229 i RE= GTE Shared Services Project Dear Mr. Cotton, * *REVISED ** coArmuinrr pmrr pt.r7urr of cworoot e... Please accept this letter as authorization to proceed with the design / construction of the site work on the GATE Shared Services project located in Coppell, TX HCBeck, Ltd - intends to issue a formal contract in the amount of $304,200, for this scope of work, plus your bond amount of $7,840.00, for a total contract amount of $312,040.00. Time amounts are reflective of your proposal dated 9/4/98 and our phone discussion on 9111198. All correspondence to be addressed to: HCBeck, Ltd- 1700 Pacific Avenue, Suite 3800 Dallas, Texas 75201 Attention_ Lonnie Mahoney If you have any questions concerning these documents, please let me know. Sincerely, O t (01, oS HCB ,Ltd. `t �'�, t ��, �"�� .� . �� Lonnie Mahoney �i¢ PP Project Manager r Q002 HC'•rc:. • 1700 15�C 1: - %kTNUE. SUITE 3400 . TEX45 7 • 214 965 -1100 F- 'x 211 40', - 1300