Verizon-PT 98091709/1G/% x9:37 CITY X COPPEL.L ENGINEERING - 214 243
• PIF i
Tr CNN WAR w
F.ARIIY GR"ING / EXCAVATION
PERMIT
IN RWVr OF WAY I FAMWMT ! PWVAIZ P11�P 1Y
I �_ I
Appmw d p(mis m= be provided Er4MM CoMrnt is TqNYW
A letter fmm die Property 0mw1FargirreerlDewe Wr is rcgmred bore permit *jU be
ime A
Date:
Project Name:
Permit Issued to:
Address: Z 7
Telephome:
Rqmewating:
General Description of type of work Oro de mpy of QPPvwd pkm)
i
Location of Work as afim mw regid eid):
Com= made with City and/or franchise polity to kKmW e xisting utilities?
(e8 hmn prior to a aavadoa)
� YE5 NO
U any excavation of pavement in street, slicy or sklewalk necesaaty?
vl rw orrasi ter aol YES NO L�
Revised 5*W
U3/16•%98 09:37 CITY OF COPPELL ENGINEERING i 214 243 522? NO. 640 W3
Ewly Grading / Ex .laden Per
PfteZ
Representatives) of the FranchisaMonwactox must adhere to all cxnsMucdm standards
approved by the City of Coppoll. whim' iachrda but is not Binh ed to: Compaction of tz enches
and bores, and barricading acmwdmg to Me Texas Manual on Uniform Traffic Control Devices.
Areas) affneted must be restored to as pod condition as before the of work
Wad ft, drainage, vegetation. erosion Control).
Any excavation requiring closing of a aim or alley must be reported to the Police (304- 3600),
Tim ( 304 -3500), Street ( 344 - 3546) and Fnginewing Departments (304.3679) prior to closing.
i
plan / trench saftty playa if a lane or stroet cloom b required.
ApphcaM shall indemnify and forever hold harmless against each and every claim, demand or
cause of action that may be made or come against it by reason of or if any way adit out of
the closure, Meeting, excavating, cutting, tunneling, or other work by the applicat under
permit from the City, if such permit is gianted.
]"Cwf a
09/17/98 THU 15:01 FAX 214 985 1383 BECK
L - 714 6 0
September 17, 1998
Mr. Earl Cotton
Cooper Excavation, Inc.
11127 Shady Trail, Suite 108
Dallas, TX 75229
i
RE= GTE Shared Services Project
Dear Mr. Cotton,
* *REVISED **
coArmuinrr
pmrr pt.r7urr of
cworoot e...
Please accept this letter as authorization to proceed with the design / construction of the
site work on the GATE Shared Services project located in Coppell, TX HCBeck, Ltd -
intends to issue a formal contract in the amount of $304,200, for this scope of work, plus
your bond amount of $7,840.00, for a total contract amount of $312,040.00. Time
amounts are reflective of your proposal dated 9/4/98 and our phone discussion on
9111198.
All correspondence to be addressed to:
HCBeck, Ltd-
1700 Pacific Avenue, Suite 3800
Dallas, Texas 75201
Attention_ Lonnie Mahoney
If you have any questions concerning these documents, please let me know.
Sincerely, O t (01, oS
HCB ,Ltd. `t �'�, t ��, �"�� .� .
��
Lonnie Mahoney �i¢ PP
Project Manager r
Q002
HC'•rc:. • 1700 15�C 1: - %kTNUE. SUITE 3400 . TEX45 7 • 214 965 -1100 F- 'x 211 40', - 1300