Loading...
DR8902-CS 880829 CITY OF COPPELL Consultant Work Order Date August Z9, 1988 TO: Consultant Oinn, Inc. Description Of Proposed Project: Evaluation of the Storm Drainage System in the vicinity of Pelican Road, as a follow-up to the Storm Report and flooding events of July 1Z, 1988, at the following addresses in Northlake Woodlands, Phase VI.' - 763 Pelican; Block F, Lot 17 - 767 Pelican; Block F, Lot 18 - 771 Pelican; Block F, Lot 19 Reference or Purpose of Project: Follow-up on July lZ, 1988 Storm in Coppell. (See Attached Memo from Russell Doyle to City Manager, dated July 19, 1988). Staff Contact: SHOHREDANESHMAND Authorization For Project: City Manager/Director Signature Estimated Project Cost As Follows: Number of Hours of Labor 2~ /~ Labor Cost $ C Material Cost $ /d/~ Total Estimated Cost 0 u L T Estimated T~e Required to Complete Project: ~ A N Project Manager: _ /~,~ ~t~ Telephone Consultant's Authorized Signature ~/~ ....~...~ . / Project Number Assigned Funding Source: F Fund G/L Account No. Account Description I Funding and Approval: N A C Director of Finance Date July 19, 1988 MEMORANDUM TO: Alan Ratliff, City Hanager FROM: Russell D~City Engineer RE: Engineer's Report on July 12, 1988 Storm BACK GROUND: This is the preliminary report for the July 12, 1988 storm. Attached are: 1) a list of the calls received; and 2) a list of action taken. I have (or will) contacted each person to interview them on the phone and/or visit with them at their respective site(s). The major part of the damaging storm that day lasted from approximately 7:15 p.m. to 8:30 p.m., and we have had reports of rainfall being from 2~ inches to 4~ inches. (The 100 year rain would be 4" in one hour). If we had greater than a 100 year storm, assuming that was the design storm, then it is reasonable to believe that there could be property and structure flooding. If the flooding I witnessed on Mockingbird Lane between Sandy Lake Road and Cherrybark is representative, then we had a greater than the design 100 year rain. As you know, the two major flooding areas were on Pelican Lane and North Shady Dele. The other reported areas have not yet been field inspected and researched by me. I will complete that work this week, and would anticipate having at least a preliminary engineering solution for each site by August 15, 1988. PRELIMINARY CONCLUSIONS: It appears that this area is drained by a system that was desiKaed, constructed and approved with by City, Therefore, a re-~valuation will need to be done that will involve securing the design records, evaluating, developing an engineering solution timt will lumdle these more severe storms, and then identify funding, etc. NORTH S~L~DY DALE: As I understand, Skaggs Alpha Beta is committed to install improvements from their site to the High School site. That would seem to be the solution for this area. I am pursuing this matter. RD/ls~ xc: Chief Jackie Mayfield Chief Tom Griffin Steve Goram Wayne Cinn Kevin Peiffer Shohre Daneshmand Dale Jackson 7/12/88-STORN l~.~lOI CITY OF COPPELL S~0RMALER~ CALLS FOR THE JULY 12, 1988 STOP,}i ~ ADDRESS NAME PHONE PROBLEH 100 N. Shady Dale Lester Davis 462-0579 Back yard flooding and ditch on Sandy Lake Road. (Has letter promishg improve- ments). 120 N. Shady Dale Raymond Hawkins 462-9060 Reported water in (visited Doyle house (Den & Barn) A.M. 7/18/88) washed out around house. (May sue) 132 N. Shady Dale Mr. & Mrs. 462-0568 Flooded Garden, Vernon Jenkins drowned chicken. 136 N. Shady Dale Clifton Odes 462-1058 Water in house. ~ ~/~.~./? 763 Pelican Reid Baker 462-8273 Water inhouse. g~/~ 7~7 Pelican KawadaMamoru 462-8410 Water inhouse. (Smokey Wideuer ..... 436-1927) /~/{~ 771 Pelican Tom C, uidry 462-8319 Water in house." (Roy Brock .......... ) (No real damage) 145 Hill Susan Robertson 393-1084 ~ater in house. ($800 - Damage) 141 Hill Gary Henlic 309-7605 Minor damage. 577 Rocky Branch Joy Matthews 462-1810 Flooded pool and yards. (Fence encroaclm2nt8.) Paul Caironi Pres. 550-7899 On-site flooding, & at Homeovners/Neadovridse Apts. (Ext.271) south property line. 232 Samuel Robert Yates (H) 471-2024 8" water @ front door Meadov~idge Condos (0) 243-1501 of residence. Unit 1-0 412 Kaye Street Gilbert Welch 471-2044 Flooded yard & garage. 726 E. Bethel Randy Wright 855-7320 Alley Flooding. School Road (work i) 409 Headowcreek Bill Johnson 662-1615 532 Carter Drive Charles Lambert 662-1733 Roof Leak Briar$1en/Pelican Water Vac ~11 Woodhurst & Sandy Knoll Water Ponds Shadowcrest & Sandy Knoll Water Ponds CITY OF COPPELL CITY ENGINEER FOLLOWUP ACTION FOR JULY 12, 1988 STORM - Called on all reported flooding situations (see attached list), informed them we are investigating all complaints and follo~up. Referred to City Secretary's Office for damage claims. - Notified Design Engineer for the Pelican Lane flooding. - Recieved Police Department List (7-14-88) and Public Works Department List (7-15-88). (ATTACHED) - Per the Public Works Department, confirmed that all Drainaie Systems were operational, - Consulting staff and Ginn, Inc. on problem areas. - Received varied reports on rainfall from 2~" to 4%" (over 4" would have been a greater that 100 year rain fall for one hour). (Will Document) .41" - Weather Bureau (@ Dlrd Airport) 4~" - S. Holly Street 4" - Fire Department 3.10" - Public Works Service Center 7/i2/88-s~oRM HEH01