DR8802-CS 900530 COPPELr. PUBLIC WORKS
~MOR~NDUM
)~ay 30, 1990
TO: Steven G. ~am, Director of Public Works
FROM: Larry D~%~i~fPublic Works Inspector
RE: Kaye Street Drainage (Tickler 5/30/90)
Per your request on May 30, 1990, I am responding with a status
report on the Kaye Street Drainage issue.
On this date I made telephone contact with .Mr. Ron Morrison with
Kimley-Horn & Associates to discuss the field survey conducted by
his fi~m on Kaye Street.
¥~. Morrison indicated the field survey was complete and the re?~.~:~t.
was being written at this time and would be transmitted to cLty
staff via facsimile on or befcre :{ay 31, 1990.
Fm. Morrison outlined three se~ents of 'the reporu a]]c .....
follows:
1. The existing surface condition containing the surface drainage
water is enhanced by the construction of drainage swales. Mr.
Morrison indicated the swales were constructed by Fox
Jacobs during subdivision construction and requi:::e
to allow for proper drainage flow.
2. Based on his current survey and prevfous ¢:omplai.:~xs,
overall construction of the subdivision adj~.-;enr [.~
Street was not at fault.
3. The proposed insta].lauion of a 3" p.v.c. ~sain syste3: 5'h_3c~ugn
the curb to Spanish Moss was a workable idea.
If I can be of further assistance, please !et me know. 'I'ba:~iK you.
(Status 5/31/90)
CLD/sm
cc: Shohre Danes~mand, P.E., Acting City En{]'ineer
Ben dela Cruz, Engineer Technician
Per Birdsall, Street Superintenden%