Loading...
Coppell Heights 9-CS070119 DEVELOPMENT FEE TABLE Project: Coppell Heights Addition Lot 9C (only) Date: 1/19/2007 (revised 2/5/2007) PRELIMINARY TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $11,844.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $408.68 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $9,082.50 irrigation info (100% due at Issuance of Water Meter) not provided Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 irrigation info (100% due at Issuance of Water Meter) not provided Wastewater Impact Fee $9,594.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $250.83 $250.83 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) 1/ Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) ITOT AL II $31,700.01 I I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $250.83 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Coppell Heights Addition Lot 9C (only) 1/19/2007 (revised 2/5/2007) PRELIMINARY Water Impact Fee: Domestic Meter(s): 2 - 2 inch = 10.66 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 2 u 8 inch = 2.5 ESU's IrriQation info not provided Total #: 13.16 ESU's @ $900.00 ea. (Due prior to issuance of building permit) $11,844.00 Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $200.00 Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $408.68 Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $0.00 $0.00 $4,541.25 $0.00 $0.00 $9,082.50 Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $60.00 Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $60.00 Wastewater Impact Fee: Total Domestic Meters ESU's: 10.66 @ $900.00 ea. (Due prior to issuance of building permit) $9,594.00 Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) $100.00 Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $250.83 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Heights Addition Lot 9C (only) 1/19/2007 (revised 2/5/2007) PRELIMINARY ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Area (sf) Development Units ** Vehicle Miles per Development Unit ** ee per Vehicle Mile *** ct Fee due = (Development Units) x er Development Unit) x (Fee per Vehicle Mile) = 1 Retail/Commercial Commercial Others Not S ecified 13,000 13.00 7.92 $150 $15,444.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 u Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) Does not include 4000 square feet of restaurant I see attached fee calculation for restaurant fee Assessment paid for N-S Belt Line Road in the amount of $22,165.17 $6,972 used for restaurant site leaving a credit balance of $15,193.17 to offset this impact fee $15,444 - $15,193.17 = $250.83 due J:AMQ(!1VtP(!~m: ......... . .......... . ......... . .......... . ......... . .......... . )$.~$~l~~1 DEVELOPMENT FEE TABLE Project: Coppell Heights Addition Lot 9C restaurant (only) Date: 1/19/2007 (revised 2/5/2007) PRELIMINARY TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available 000% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) ITOT AL II $0.00 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Coppell Heights Addition Lot 9C restaurant (only) 1/19/2007 (revised 2/5/2007) PRELIMINARY Water Impact Fee: Domestic Meter(s): 0 = 0 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): o - 8 inch = 0 ESU's Total #: o ESU's @ $900.00 ea. (Due prior to issuance of building permit) $0.00 Water Tap Inspection Fee: Total #: o Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $0.00 Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $0.00 Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $0.00 Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $0.00 Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $900.00 ea. (Due prior to issuance of building permit) $0.00 Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) $0.00 Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $0.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $0.00 Information not Available Information not Available Information not Available ROADW A Y IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Heights Addition Lot 9C (only) 1/19/2007&~~ed2/5/200~ PRELIMINARY ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Area (sf) Development Units ** Vehicle Miles per Development Unit ** ee per Vehicle Mile *** 1 Retail/Commercial Restaurant 4,000 4.00 11.62 $150 t Units) x 'cle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,972.00 * (Figure 4.1 _ Roadway Impact Fee Study) ** (Table 4.10 _ Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) Does not include 13000 square feet of retail I see attached fee calculation for retail fee Assessment paid for N-S Belt Line Road in the amount of $22,165.17 offsets the Roadway Impact Fee (balance of credit for future offset is $15,193.17) 1<' .:...AMfitJN:tjjtji#:........ ......................${jlQi:i~