Loading...
Park West CC(11)-CS 910828~~ ~ ~~ The City With A Beautiful Future August 28, 1991 Mr. Dennis Chovan Albert Halff Associates 8616 Northwest Plaza Drive Dallas, TX 75225 Re: Lot 3, Block 7, Park West Commerce Center Development Plans and Fee Assessment P. O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 Attached please find seven (7} approved sets of final construction plans for the above referenced project. You will also find a list of the development fee assessment related to this project, dated August 28, 1991. Please provide a check construction cost for City of Coppell, and Bebermeyer, Finance D~ with your check, please or the contract cost. in the construc forward apartment, include a amount of $95,406.20 plus 2$ of the lion inspection fees made payable to the it to the attention of Ms. Carolyn no later than September 13, 1991. Along copy of either the construction estimate If you have any questions, please contact Ben dela Cruz or myself at (214) 393-1016. We appreciate your timely attention, and look forward to working with you on this project. Sincerely, L~ ~~ - ( J~l M. Shohre Daneshmand, P.E. Acting City Engineer MSD/bd cc: Gary L. Sieb, Director of Planning and Community Services Steve Goram, Director of Public Works Larry Davis, Construction Inspector Taryon Bowman, P & Z Coordinator Carolyn Bebermeyer, Finance Department Al Blaine, Prentiss Copley Investments PARKWI CITY OF COPPELL DEVELOPMENT FEES Date: August 2$, 1991 Project: Lot 3 Block 7 Park West Commerce Center Park Fee Assessment NA Water Impact Fee $ 27,720.00 (100 due prior to Council approval of final plat} Water Tap Inspection Fee $ 700.00 (100$ due prior to issuance of building permit) Wastewater Impact Fee *$ 13,504.00 (100 due prior to Council approval of final plat) Sewer Tap Inspection Fee NA Street Sign Assessment NA (see attached) Street Light Assessment NA Roadway Assessment $ 54,082-. 20 470.28 X $115 F.F. Street Cut Permit $ 100.00 + (2$ of Construction cost) $ in the amount of $ provided by Engineers TOTAL AMOUNT DUE: $ 96,106.20 (Plus 2~ const. cost) TOTAL DUE BY 9-13-91 * NOTE: IF PROPERTY TO BE DEVELOPED DISTRICT #1, THIS FEE SHALL COLLECTED UNTIL SUCH TIME BETWEEN THE CITY AND MUD. PAYABLE BY 9-13-91 $ 27,720.00 $ 13,504.00 NA NA NA $ 54,082.2 0 $ 100.00 S $ 95,406.20 $ 95,406.20 (Plus 2~ const. cost) IS IN THE COPPELL MUNICIPAL UTILITY BE ASSESSED, BUT SHALL NOT BE AS AN INTERLOCAL AGREEMENT IS MADE 6 ~D ~ 2 2 ~~ ..•~ DATE: TO: FROX: RE: .-. ~ - j 1 i .;~ ~` COPPELL PUBLIC WORKS I ~ i ; (T ~ ~ , .-~- ~ MEMORANDUlI ~ i ~~ 1 i MAY 2 2 I ~- !i ~ ~ ,i~, May 17, 1991 , j, ~ L ~ l _._..____ '-' d~ i_._ ~. Shohre Dan and, Acting City Engineer Howard afford, Water Utilities Superintende Development Fees for Lot 3 Block 7/Parkwest Center The following fees should be assessed on the above referenced project . Water Impact Fee: 4 - 2" Domestic Meter/s = 32 ESU^s I - 1 1/2" Irrigation Meter/s = 5 ESU's 2 - IO" Fireline Meter/s = 5 ESU's Total 42 ESU's @ $660.00 ea = 527,720.b0 100$ due prior to Council approval of final plat. Wastewater Impact Fee: 4 - 2" Domestic Meter/s = 32 ESU's @ $422.00 = $13,504.00 100 due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 7 Connections @ $100.00 each = S 700.00 100$ due prior to issuance of building permit. Sewer Tap Inspection Fee N/A Connections @ $I00.00 each = I00~ due prior to issuance of building permit. Street Lighting Fee N/A Sha1Z be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee N/A See attached Street sign assessment sheet. I00$ due prior to final acceptance of project. Park Fee N A Residential Lots at $I50.00 each = S N/A N A Units (Multi family) at $75.00 each = S N/A 50~ of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50$ remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works PKWEST .HLP STREET SIGN ASSESSMENT for Lot 3 Block 7/Parkwest Commerce Center The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parkinq 553.10 Speed Limit 563.54 Yield 558.56 Stop 565.12 Street Name 511.60 Stop & Street Combo 596.85 OTHER TOTAL * Cost breakdowns may be obtained from Public Works by written request. Revised 4 /1 /91