DR9202-PR 911030 PROPOSAL FOR ENGINEERING SERVICES CITY OF COPPELL PHASE 1 DRAINAGE IMPROVEMENTS 1008.91.391~ BROOKS L~a~ - STAGE I DIVERSION A. Description of Project Design of storm sewer improvements to relieve street flooding in the Hunterwood Subdivision. The basic services work plan includes the investigation into other design options which may provide some interim flood protection at 415 Brooks Lane. B. Scope of Work Basic Services Phase l - Investigate Construction Phasing Alternatives This phase addresses the city council and staff commems on the cost of the Brooks Lane Stage I drainage improvements. Water overtops the curb in the 400 block of Brooks Lane (Hunterwood Subdivision) and the homeowner at 415 Brooks Lane has reported garage flooding. The existing storm sewer system in the Hunterwood Subdivision has approximately 5-year capacity. Overflow was originally designed to pass between the houses flowing to Stream Gl. These overflow paths have been blocked by fences and landscaping. The Stage I alternative in the "City-Wide Sto~m Water Management Study" provides 25-year protection within this neighborhood and includes additional inlet capacity on Brooks Lane. Other alternatives which have been discussed since the publication of the above referenced report are: · Inlets on Brooks Lane without the diversion. · Diversion with stubouts for future inlets. · Diversion to proposed Bethel School Road. · Use of the existing sanitary sewer easement for the diversion. This would require significantly more cost in fence and landscaping repairs, however, an easement would not have to be acquired. · Flood proo£mg for the residence. Preliminary cost estimates and a council presentation (1 maximum) are included to aid in the final budgeting of funds for this project This phase Page 1 PROPOSAL (cont.) BROOKS LANE - STAGE I DIVERSION is independent of the other basic services and may alter fees shown in the subsequent phases. Phase 2 - Survey for Design · Set Control · Design Surveys Phase 3 - Design Services · Prepare construction drawings Utility conflicts Inlet design Diversion design · Update cost estimates for final design · Obtain plan approval from the city 1 staff meeting (maximum) 1 council meeting (magimum) - additional staff meetings or property owner coordination will be substituted if a council meeting is not required. · Prepare construction contracts and specifications Phase 4 - Easement Documentation This task includes the preparation of a legal description for the required easements. Services Not Included in this Contract · Bidding and contract award · Contract aclminislmfion · Survey for consu'uction · Full time or half time resident consn'uction inspector · Consulting services by others except as noted in the Scope of Work · Filing fees, permit fees and taxes · Certification that work is built in accordance with plans and specifications · Environmental impact assessments · Survey for preparation of record drawings · Printing of plans and specifications over and above those reqtdred for city review. Page 2 PROPOSAL (cont.) BROOKS LANE - STAGE I DIVERSION C. Fee Proposal Phase 1 - Investigate Construction Phasing Alternatives* $2,961.00 Phase 2 - Survey for Design $3,855.00 Phase 3 - Design Services Construction Plans and Specifications $10,282.00 Phase 4 - Easement Documentation $3,450.00 Total Basic Fee Proposal $20,548.00 Fees quoted for subsequent phases may be altered by the results of the Phase 1 analysis. The Basic Fee for the services described above will be based on a l-rap sum fee of $20,548.00. The engineering services will be billed monthly or at the completion of each phase, whichever comes frrst. The work will be invoiced on an hourly basis of 2.13 times salary costs. Salary cost as defined by the ASCE Manual and Report on Engineering Practice No. 45 is the cost of salaries (including sick leave, vacation, holiday and incentive pay) for time directly chargeable to the project, plus unemployment, excise and payroll taxes and contributions for social security, employment compensation insurance, retirement, medical and insurance benefits. Direct costs such as reproduction, sub-consultant services, long distance phone calls, deliveries, etc. will be billed at 1.10 times cost. Computer charges will be invoiced at 1.0 times cost. Phase 1 will be completed two (2) weeks from the date of approval of this conuact. Subsequent schedules will be provided at the completion of Phase 1. This proposal will serve as the engineering services contract upon execution in the spaces below: Albert H. Halff Associates, Inc. Accepted: City of Coppell By: ~//~"~ ~(~ By: Title: /tlt~/P,~,',/~.-~. Title: Date: [0/~/~/ Date: Page 3 - · ~.,,~.,:_. -._.'-: ....... . ........ · COOPER RD. lo' INLETS ........ 7 '-~ --: ,~ ~ COZBY ___: __ ' ~r--- .... -'~=f' .... STAGE I " ' .' Ei4~l I'---I ~.'~,.- ~ 1 '~"-~ ..=.. LJ INSTALm"L~C~.~- ~-~' ~-~ ~ d I~I'ST, aLL 2 I~-RCP~ ..... =~. '' z~ -- ~ , ~ o~ '~ ~ LN 10' INLETS~ &~ '" ; ..~.-..' ~ ~ BROOK · , '~~~ .. :.?': .F~ ; .... .._ :.- ~ ~ ~. ,~s-~ ,' ~T~ - .-' , / ////-.: ./ STALL 2-10 ~ _ _'__ ' - ~'~- / /" ~Sr~h ~CP LATERAL~ '-": AND ~LL · ......' -' :-/ ~/':~ ...... .... - ......... .,- -. .._. ,.~ :.-:,. .... . _- ..... . .> I;.: ~ ., ~-~ ........... - · ~l=.~-'-u, ~ ,' ~ ........ ~ ~ ~ ? ~ ~ , ~.~ ~~ -- .......... / ~/ ~ ~. ,... ~'~ FIGURE VII-3 SITE C ~ BROOKS LANE/HUNTERWOOD 0 100 200 300 ~- ~ DRAINAGE IMPROVEMENTS SCALE IN FEET