Loading...
ST8703-CS 900119r—. D. T. CONSTRUCTION, INC. 2221 East Lamar Blvd., Suite 950 Arlington, Texas 76006 817- 640 -8200 D L L9 lL�l January 19, 1990 Mr. Russell Doyle, City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Reimbursement to D. T. Construction, Inc. for Costs Related to The Meadows Section VI Dear Russell: Mr. Ratliff had asked me to prepare a pay request for your review and approval of the City Council. Attached is the documentation regarding the request, along - with a letter certifying the costs from the Project Manager, Kevin R. Kendrick, P.E. The request is summarized as follows: Engineer's Certified Costs $46,538.23 M.U.D. Inspection Fees 765.58 Construction Management 2.154.55 Total Amount of Request $49,458.36 We respectfully request that this item be placed on the next possible Council Agenda. If you have any questions, don't hesitate to call. Aordon , ®� �O GDJ /mlk D. Jone s Vice President Attachment y U«