Loading...
DR9101-LR 910912Hooper Engineering Labora Geotechnical Engineering · Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: M-S Utilities DATE: 12 September 1991 PROJECT: Oak Trail Storm Sewer Line, Coppell, TX MATERIAL DESCRIPTION: 1) Flex Base ASTM D1557 MODIFIED PROCTOR: 1) 123.0 pcf @ 10.0% Moisture LOCATION PROCTOR LIFT % PCF % Willow Lane 14) approx. 40' east of Oak Trail 1 Flex Base 9.6 113.7 92.5 north shoulder 15) approx. 90' east of Oak Trail 1 Flex Base 11.6 104.0 84.5* south shoulder 16) approx. 150' east of Oak Trail 1 Flex Base 10.1 106.3 86.4* north shoulder 17) approx. 225' east of Oak Trail 1 Flex Base 8.2 115.9 94.2 south shoulder MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % 92+ *Test results indicate fill is not compacted to required density/moisture. Contractor advised. TECHNICIAN: CDJ DISTRIBUTION: (2) M-S Utilities Route 5, Box 91, Rockwall, TX 75087 Rockwall, TX 75087 (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351,6419