Loading...
ST8504-CS 920626 (2)L 0 y With A Beautiful Future Mr. Mike Daniel, P.E. Nathan D. Maier Three Northpark 8800 N. Central Expressway, Suite 300 Dallas, TX 75231 Re: Riverchase Drive Phase II & III Dear Mr. Daniel: FILE P.O. Box 478 Coppell, Texas 75019 214 - 462 -0022 The City of Coppell has received and reviewed the construction plans for the referenced project. These plans meet our current minimum requirements. Prior to the start of construction, the following items should be completed: 1) The issue concerning the impact fee for the water irrigation tap near the intersection of Sandy Lake and Riverchase Drive should be resolved. As per our conversation on June 26, 1992, there is some question as to whether or not this line was installed. My recommendation is to uncover the line and verify that it was installed. You should have your contractor coordinate this with Howard Pafford, Water Superintendent. 2) The inspection fee, in the amount of $7,112.16, should be paid to the City of Coppell. Please forward the check to Mr. Alan Johnson, Assistant Finance Director, and forward a copy of the paid receipt to the Engineering Department. 3) A preconstruction conference should be scheduled. If any of the above items have already been completed, please disregard. If 1 can provide any additional information, please feel free to contact me at you convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer ID A 111 cc: Ga y L. Sieb, Director of Planning and Community Services S eve Goram, Director of Public Works lan Johnson, Assistant Director of Finance Larry Davis, Construction Inspector Jerry Ragsdale, RPG Estates, Ltd. June 26, 1992