Chautauqua-CS 921027COPPELL PUBLIC WORKS MEMORANDUM DATE: October 27, 1992 TO: Garreth Campbell, Construction Inspector FROM: Howard L. Pafford, Utilities Superintendent. RE: Walk-through Punchlist for Chataqua Place - Water/Sanitary Sewer This morning a walk-through was conducted on the above referenced project by Utilities field personnel. The following items were found deficient on this project. 1. Sta. 0+00 - Manhole ring needs regrouting 2. Bethel School and Harris - The mainline valve stack needs replacing. The fire hydrant valve stacks needs replacing. 3. Sta. 1+32.00 - Remove wood from under manhole ring and regrout. 4. Bethel School Road - Second fire hydrant valve - need to replace stack 5. The two main line valves in project - stacks need to be replaced. 6. Sta. 5.44.46 - Need to reset cleanout and cut and plug pipe. 7. Lot #4 - Needs new meter yoke 8. Lot #7 - Reset meter yoke and can 9. Main line valve on Harris - Need to replace stack. Please insure that each of these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP/dm CHATAQUA.HLP COPPELL PUBLIC WORRS DATE: October 27, 1992 TO: Larry Davis, Construction Inspector FROM: Rey Gonzales, Street Superintendent RE: Walk Through Chataqua 10/27/92 The following items were found to be deficient this morning during our walk through of this project: - Random crack at approach of Dakota cul-de-sac (in radius). - Ponding at eyebrow. - Seal block out at North approach onto Harris. - Remove loose chips at saw joint and seal (old/new). - Clean up dirt in street North end of approach and along Harris - both sides. - Replace curb North of inlet on West side of Harris. - Seal inlet approach on West of Harris. - Complete area drain in median section. If you have any questions, please let me know. RG/bc STCHATA.RG ~--' _ ~.c--______