Loading...
Chautauqua-LR 920727reed engineering ®G°~OMG~ GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT REPORT NO.: 2 JOB NO.:10 8 2 DATE CAST: 0 7/ 2 7/ 9 2 PROJECT: Chautauqua Place SPECIFICATION:3OOO PSI LOCATION:Inlet walls 4+41 Dakota Lane/Inlet pUANTITYREPRESENTED:8/8 walls 2+50 Harris Road ARCHITECT/ENGINEER: SAMPLED BY: M. Lawson CONTRACTOR: HCH Construction, Inc. BvoRDEROF:Client 08/24/92 REPORTED TO: MatheWS Investments, SouthwestDATE:08/03/92 ORDER NUMBER: (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SO. IN. LABORATORY NUMBER FIELD NUMBER: CP072701 CP072702 CP072703 CP072704 MAXIMUM LOAD, Les: 116 , 5 0 0 115 , 0 0 0 15 3, 0 0 0 15 6, 5 0 0 AGE WHEN TESTED, DAYS: 7 7 2 8 2 8 COMPRESSIVE STRENGTH, PSI: 412 O 4 O7 O 5 410 5 5 4 0 41 O O 5 4 8 0 AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: DOeS comply Wlth Specification METHOD OF CURING: FIELD 1 DAYS, LABORATORY FROM O 7 / 2 8 / 9 2 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 9 8 °F MIX 9 4 °F, AIR CONTENT %, SLUMP 4 IN HES C TIME OF SAMPLE: O 3 ' O O A ,~M PICK-UP CHARGE: } ~ `LES NO SOURCE OF CONCRETE: Lattimore MIX CODE: TICKET NO.: 891$9 FINE AGGREGATE: UNIT WEIGHT PCF COARSE AGGREGATE: WATER: YIELD CFICY CEMENT: FLY ASH: ADMIXTURE(S): ~I~rRI~'~t~an D. Maier Consulting Engineers/Mr. Michael Garre t ~1) City of Coppell/Mr. Garreth Campbell (1) Rebcon Inc./Mr. Rick Burgett (1) HCH Construction, Inc./Mr. Mark Hicks SIGNED 1 1 TEST METHODS: ASTM C 31, C 39, C 143, C 173, C 182, C 231, OR C 1064 PAGE_OF_ 2424 STUTZ DRIVE ^ SUITE 400 ^ DALLAS, TEXAS 75235 ^ 214/350-5600 ^ (FAX) 214/350-0019