Chautauqua-LR 920731reed engineering GEOTECHNICAL CONSULTANTS July 31, 1992 Project No . 1082 Report No. 2 Matthews Investments Southwest, Inc. 5220 Spring Valley, Suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Utility Trench Backfill Chautauqua Place Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period of July 10 through 27, 1992. During the above period, 17 field density tests were performed on the utility trench backfill. Test results are shown on Plate 1. Where tested, the materials were found to be in compliance with project specifications. If any questions arise, do not hesitate to call. Sincerely, THE REED ENGINEERING GROUP Ronald F. Reed, P.E. RFR/wde copies submitted: (2) Matthews Investments Southwest, Inc./ Mr. Tim House (1) Nathan D. Maier Consulting Engineers/ Mr. Michael Garrett ~(1) City of Coppell/Mr. Garreth Campbell (1) HCH Construction, Inc./Mr. Mark Hicks 2424 STUTZ DRIVE ^ SUITE 400 ^ DALLAS, TEXAS 75235 ^ 214/350-5600 ^ (FAX) 214/350-0019 CHAUTAUQUA PLACE COPPELL, TEXAS REPORT NO. 2 reed engineering ~ ° o [°~ Field Density Tests on Utility Backfill Depth Com- Below Unit pac- Final Bry Moisture tion Test S. G. Weight Content Curve Level Date No. Location feet (pcfl (~) No. 07-10-92 13 Line B, 5+20 2.0 107.7 16.1 CE-1 97.0 14 Line B, Lat. @ A/20 2.0 105.6 16.4 CE-1 95.1 15 Line A, Lat. @ A/1 2.0 105.8 16.2 CE-1 95.3 16 Line A, Lat. @ A/1 4.0 104.6 21.0 B-2 98.3 17 Line B, 1+40 5.0 105.6 16.6 CE-1 95.1 07-24-92 18 Line B, 1+20 2.0 101.9 I9.1 C-1 98.2 19 Line A, Z+00 2.0 100.2 19.6 C-1 96.5 20 Line A, 3+20 1.0 207.9 14.3 C-2 95.8 21 8" Water Service @ B/7 1.0 100.9 19.7 C-1 97.2 22 8" Water Service @ B/9 1.0 103.4 19.8 C-1 99.6 07-27-92 23 8" Water Service @ B/1 1.5 103.2 21.4 B-2 97.0 24 8" Water Main Bethel School STA 0+50 2.0 104.9 18.3 B-2 98.6 25 8" Water Service @ A/3 2.0 104.9 18.3 B-2 98.6 26 8" Water Main Dakota Lane STA 3+00 2.0 101.6 16.7 C-1 97.9 27 8" Water Main Dakota Lane STA 2+00 2.0 101.6 16.8 C-1 97.9 28 8" Water Main Dakota Lane STA 1+50 3.0 107.2 13.9 C-2 95.2 29 8" Water Main Dakota Lane ~I STA 0+50 1.5 105.7 18.9 CE-1 95.2 Test locations are referenced from plans dated September 19 91. Plate 1 GEOTECHNICAL CONSULTANTS