Loading...
Summit P1-PT 980113M -4111 1 11 � 3 e City With A Beautiful Future P.O. BOX 478 C ONSTRUCTION DEVELOPMENT COPPELL, TEXAS 75019 PERMIT APPLICATION 1. Name of Address: Phone N 2. Location of Construction (address): 5� .9-r -%M— SPw`�S Subdivision Section # Block # Lot # Or: Survey /Abstract # Acreage Location description (attach vicinity map) 'M�Aj LE E l42 { 20 3. Type of proposed construction or development: (✓Residential ( ) Alteration of a natural waterway drainage course ( ) Non - residential ( ) Placement of Fill (in right -of -way or on private property) ( ) Other (describe & attach drawing or sketch) P.O. Box 478 Coppell, Texas 75019 972- 462 -0022 4. Description of Construction Permit requested: ( ) Paving ( ) Median or Landscaping ( ) Box Culvert ( ) Sidewalk ( ) Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge ( ) Water Main ( ) R.C.P. ( ) Sanitary Sewer Main ( ) Flume ( ) Inlet ( ) Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation (lope Protection Retaining Wall ( ) Parking Lot + Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. Im" sus CONSTRUCTIOP"$EYELOPNI 1N I PER I P.O. Box Page Coppell, Tex Texas 75019 Tha city With A H pautif ul F uture P.O. BOX 478 cMWE4hWlAsf06W the City of Coppell Subdivision Ordinance, Standard n Details, Streetscape Plan and stamped approved plans. The activity shall be in with Erosion and Sedimentation Ordinance. 6. Applicant shall provide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculation. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. Amount Paid (� p . Date Paid �J NOTE: A separate excavation permit is required anytime pavement is cut or when there b work in the right -of -way not approved by the City Engineer. V13 --q� Signature of Applic Date FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? () Yes (-) If yes, then a Floodplain Development Permit is required before any construction can begin. Is additional information required? O Yes (' 1"o Are other f eral, state or local permits required? ( ) Yes ( No PER MIT APPLICATION APPROVED ( ) PERMIT APPLICATION DISAPPROVED Rik City Approval Date SERVICE CONTRACT CUSTOMER: BRANCH PROPERTIES, INC. Attn: Mike Wagner 1601 N. Elm, Suite 1700 Dallas, TX 75201 -7241 AGENT (BILL TO): FULTS PROJECT SERVICES Attn: Bruce R. Heller 9400 N. Central Expy, 5th Floor Dallas, TX 75231 PROJECT: Summit at the Springs Contract No. 95066 -010 Date: 1112/98 This contract is subject to all terms and conditions hereon and indicated in attached Exhibits. CONTRACTOR: NOTE: THIS CONTRACT MUST BE ACKNOWLEDGED BY EXECUTING KURT METZ MASONRY AND RETURNING ONE (1) COPY WITHIN TEN (10) DAYS OF ISSUE Attn: Kurt Metz DATE. THIS CONTRACT IS PREPARED BY AGENT FOR CUSTOMER. 3812 Parkmont Drive THIS CONTRACT SHALL BE VALID WHEN SIGNED BY CUSTOMER Piano, TX 75023 AND CONTRACTOR. Scope of Work required by Contractor: Provide all materials, labor and equipment to construct stone retaining wall along alley. Plans and Specifications: All work shall be in accordance with construction plan prepared by Dowdey Anderson, 5225 Village Creek, Suite 200, Plano, TX, 75093, dated October, 1997. Contract Period and Completion Date: Contract period shall start 1/12/98 and be complete byl /19/98. Contract Price and Payment Schedule: Contract price shall be $5,000.00. Payment of $2,100.00 shall be made upon payment of inspection fees and delivery of materials to site. Balance will be paid upon completion of all work. Special Conditions: Exhibit A (attached) is included as part of this contract. AC By: APPROVED: Customer: By: Signature Title ISSUE DATE: