Loading...
Summit P1-PT 960926CONSTRUCTION DEVELOPMENT PERMIT APPLICATION 1. Name of Applicant: A t*4" < TR ' K''`' Address: °I +00 to • GAN - f19 61" r, Z`l 1%l•• 'pw�.aas . T,c. '1 z3 Phone Number: - z , 4- S'1 l• 4 L q 2. Location of Construction (address): StAAW #ft r " AT 1,�At 5 1 20,1 , . u.s • ' A {a Subdivision Section # Block # Lot # Or: 3 A Survey /Abstract # Acreage Location description (attach vicinity map): 3. Type of proposed construction or development: (Residential ( ) Alteration of a natural waterway drainage course ( ) Non - residential () Other (describe & attach drawing or sketch) ( ) Placement of Fill (in right -of -way or on private property) 4. Description of Construction Permit requested: O Paving Sidewalk ( ) Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge ( ) Median or Landscaping QQ Water Main 04 R.C.P. (� Sanitary Sewer Main ( ) Flume �) Inlet ( ) Box Culvert (7� Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation Slope Protection Retaining Wall ( ) Parking Lot * Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. Retied sm CONSTRUCTION DEVELG -ENT PERMIT APPLICATION Page 2 5. All construction shall follow the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and stamped approved plans. The activity shall be in compliance with Erosion and Sedimentation Ordinance. 6. Applicant shall provide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculation. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. Amount Paid 2 S , 02 ° 4 • �13 Date Paid el -L N. NOTE: A separate excavation permit is required anytime pavement is cut or when there is work iWthe right -of -way not approved by the City Engineer. of Applicant FOR CITY USE ONLY a 24,i? Date If Is the fill area located in an identified flood hazard area? ( ) Yes ( ) No If yes, then a Floodplain Development Permit is required before any construction can begin. Is additional information required? Are other federal, state or local permits required? ( ) PERMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DISAPPROVED _ ( ) Yes ( ) No ( ) Yes ( ) No City Approval Date EXHIBIT "K" SCHEDULE OF VALUES r PAVING Quantity Unit Unit Bid Total Bid 1. 6" Concrete Pavement (Residential Streets) 16062.00 SY 17.05 $ 273,857.10 2. 6 -4-6 Concrete Pavement (Residential Alleys) 1255.00 SY 16.48 20,682.40 3. Lime Stabilized Subgrade 18530.00 SY 1.20 22,236.00 4. Hydrated Lime 280.00 TNS 86.00 24,080.00 5. Brick Pavers 760.00 SF 6.00 4,560.00 6. Sidewalks 1280.00 SF 3.00 3,840.00 Paving Total 7. Testing 1.00 $ 349,255.50 EXCAVATION 1. Street & Alley Excavation 15800.00 CY 1.50 $ 23,850.00 2. Unclassified Excavation 8000.00 CY 1.50 12,000.00 3. Offsite Importing 12750.00 CY 1.50 19,125.00 4. Cleaning & Grubbing (r.o.w.) 6.60 AC 1500.00 9,900.00 5. Clearing & Grubbing (fill area) 4.00 AC 1500.00 6,000.00 6. Grade to Drain 550.00 CY 3.00 1,650.00 Excavation Total 4" Services 70.00 EA $ 72,525.00 SANITARY SEWER 1. 8" PVC - SDR -35 4382.00 LF 11.80 $ 51,707.60 2. 5' Dia. Drop Manhole over Exist. 1.00 EA 3750.00 3,750.00 3. Drop Connection to Exist Manhole 2.00 EA 4000.00 8,000.00 4. 4.0' Dia. Manhols 13.00 EA 1800.00 23,400.00 5. Cleanouts 6.00 EA 500.00 3,000.00 6. 4" Services 70.00 EA 350.00 24,500.00 7. Testing 1.00 LS 5500.00 5,500.00 8. Trench Safety 1.00 LS 1000.00 1,000.00 Sanitary Sewer Total S 120,587.60 WATER 1. 8" PVC DR -14 4740.00 LF 13.05 $ 61,857.00 2. 6" PVC DR -14 140.00 LF 11.04 1,545.60 3. 8" Gate Valve 12.00 EA 500.00 6,000.00 4. 6" Gate Valve 8.00 EA 400.00 3,200.00 5. 16" x 8" Tapping Sleeve & Valve 2.00 EA 2750.00 5,500.00 6. Fire Hydrants 8.00 EA 1350.00 10,800.00 7. C.I. Fittings 2.00 TN 3000.00 6,000.00 8. 2" Blow -off Valves 4.00 EA 600.00 2,400.00 9. 1" Services 70.00 EA 435.00 30,450.00 10. Irrigation Services - 1 ''h" 1.00 EA 500.00 500.00 11. Irrigation Services - 1" 5.00 EA 435.00 2,175.00 12. Irrigation Services - 4" 260.00 LF 8.00 2,080.00 13. Testing 1.00 LS 1200.00 1,200.00 Water Total $ 133,707.60! STORM SEWER 1. 48" RCP -3 33.00 LF 86.21 $ 2,844.93 2. 42" RCP -3 75.00 LF 71.25 5,343.75 3. 36" RCP -3 148.00 LF 54.02 7,994.96 4. 30" RCP-3 214.00 LF 41.11 8,797.54 5. 27" RCP -3 20.00 LF 36.46 729.20 6. 24" RCP -3 754.00 LF 32.15 24,241.10 7. 21" RCP -3 583.00 LF 28.28 15,921.64 8. 18" RCP -3 46.00 LF 24.99 1,149.54 9. 12" Dia. SDR -.35 PVC 40.00 LF 18.00 720.00 10. 10' Curb Inlet 9.00 EA 1800.00 16,200.00 it. 6' Curb Inlet 1.00 EA 1350.00 1,350.00 12. 4' x 4' Std. Drop Inlet (including riprap) 2.00 EA 2500.00 5,000.00 13. Type "C" Hdwl. For 27" RCP 1.00 EA 600.00 600.00 14. Type "C" Hdwl. For 24" RCP 1.00 EA 550.00 550.00 15. Type "C" Hdwl. For 2l" RCP 1.00 EA 500.00 500.00 16. Type "C" Hdwl. For 48" RCP 1.00 EA 950.00 950.00 17. Type "C" Hdwl. For 42" RCP 2.00 EA 800.00 1,600.00 18. 3 - Grate Comb. Inlet 1.00 EA 2700.00 2,700.00 Storm Sewer Total S 97,192.66 EROSION CONTROL 1. Erosion Control 1.00 LS 9500.00 S 9,500.00 MAINTENANCE BOND 1. Maintenance Bond S 8,540.00 PAVING- EXCAVATION - UTILITIES- EROSION CONTROL TOTAL S 791,578.36