Loading...
DR9202-CS 920224 ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS ' SCIENTISTS * SURVEYORS DALLAS · ARLINGTON · CHIC3.(;O * 1-Ol,[Y WORTH % '.2;:-~;,:-? ::_z-.: Z= .:-o _: '.__z.~ -: ,-): -:.;: -.. .-.: -~ c: ,-' · :.'... ~'~ -,-."--. February 24, 1992 AVO 12033 City of Coppell c'q '-~' ~ --" ~' '"2~,- ...... .., P.O. Box 478 ! Coppell, Texas 7501~ Arm: Ken Griffin, iP.E., City Engineer R ane -' Sta ) Construction Plans and Specifications De~'~.' Enclosed please find a final set of bluelines of the construction plans and two bound copies of the specifications and contract documents for the above referenced project. The city comment set of construction plans is also enclosed. All comments have been incorporated into these plans including your verbal comments (1/21/91). The only outstanding issues are: · placement of the PVC stub-out, ie. existing inlet vs. proposed inlet; and · which City standard details should be utilized - We are currently using the March 1984 details, revised in 1985. Also, please note that the plans do not call out subgrade stabilization in the areas where we are removing and replacing driveway entrances. These are small areas and we feel that it would be difficult and expensive to include stabilization. Please let me know if you want this added to the plans. The Contract Documents and Specifications are also complete. City input is needed on the following items: · Currently set up to charge bidders $15.00 (non-refundable) for a set of plans and specifications; · Currently set up requiring two original copies of each bid; · Geotechnical testing is provided by the contractor, utilizing an independent laboratory approved by the City; · Construction Staking is provided by the Contractor; and ALBERT H. HALFF ASSOCIATES. INC. ENGINEERS · SCIEN'I'ISTS · S['RYEYORS City of Coppell February 24, 1992 Page 2 · Insurance Specifications - pages 3 through 5 of the Supplementary Conditions should be reviewed by city staff. Upon your approval of these plans and specifications, Halff Associates will be providing mylars of the construction plans and one original (unbound) and one bound set of the specifications and contract documents. The Bid No., date and time can either be inserted manually by city staff or if known, can be inserted prior to our final submission. Halff Associates is not under contract for the Bidding and Contract Award portion of this project. Our understanding is that this will be handled by cid' staff. Your approval of these plans and specifications will complete the Brooks Lane - Stage 1 (Partial) Engineering Services contract. The Sandy Knoll Area construction plans will be submitted for review by March 5th. We appreciate the opportunity to be of service to the City of Coppell and look forward to the completion of the Phase I Drainage Improvements. Please feel free to call if you have any questions or comments. Yours very, truly, ALBERT H. HALFF ASSOCIATES, INC. n Han~en, P E /sn Enclosures cc: Shohre Daneshmand, P.E., letter only