Petterson Addn-CS070219 THE.CITY.OF COPPELL February 19,2007 Hamilton Duffy, PC Consulting Micha P. Duffy, P.E. 601 W. Harwood Rd. Hurst, TX 76054 RE: Petterson Addition Plan Review Comments Dear .\1r. Duffy: The City of Coppell has received and reviewed the incomplete plans submitted for the Petterson Addition and has the following comments to offer: 1. A cover sheet and plat should be provided. Sheets Cl.O 2. The proposed elevations on the plans should be relocated so that they are visible. 3. You are allowed to use Hydro 35 in lieu ofTP40 for your drainage calculations 4. Additional information needs to be provided for the discharge of Drainage Area A-I, such as to what does it discharge, what is the discharge velocity, what erosion protection has been provided, etc. Based on the answers to those questions, the drainage may need to be picked up on site and piped to its discharge point. 5. Your proposed connection to Sandy Lake Rd. should not only match the existing Sandy Lake Rd., but also match the future Sandy Lake Rd. widening plans. Those preliminary plans for the widening of Sandy Lake Rd. are available in the Engineering Department. Sheet C3.0 6. Additional information is needed at the northwest corner in regard to the discharge of on site drainage. You should provide the off site contours up to the point to where this water discharges. 7. General note 6 and 8 refer to the paving plan for concrete specifications. Please be advised that plan was not provided. The City does require lime stabilization under all concrete pavmg. Construction Notes 8. You reference concrete interfaces and joints as being in accordance with details provided. Please be advised no details were provided. However, the City does not require details to be provided, but we do require you to comply with 'City of Coppell Standard Details'. 9. In all locations where you reference 'See Details' that should say 'In accordance with City of Coppell Standard Details'. The only time we require details to be included in construction plans is if it is a unique detail specific to that site development. 255 PARKWAY * P.Q.BQX 9478 * CQPPELL TX 75019 * TEL 972/4620022 * FAX 972/304 3673 2 Sheet C4.0 10. A profile should be provided of the proposed 8" sanitary sewer. 11. All fire hydrant locations and spacing should be in accordance with approvals from the Fire Marshal. 12. There should be a minimum 9' separation from your manhole at Sta. 7+51.4 and the I" water service to Lot I. 13. Please indicate the distance from the west property line to the proposed location of the 8" water line. 14. The connection of the 8" water line to the existing water line in Sandy Lake Rd. should be accomplished by dry boring. 15. The connection of the proposed 8" sewer line to the existing sewer line in Summer Place should be accomplished by dry boring. 16. Please provide additional information on how you proposing to install the sewer line on the north side of the alley and the water line on the south side of the alley. Will this require removing or replacing portions of the alley? If so, additional information needs to be provided for that. 17. Under the general notes for water improvements, any water line 10" or smaller should be Class 200 DR14. 18. No compression type fittings are allowed in the City of Coppell. You should refer to City of CoppelI Standard Construction Detail #4145. We only allow threaded, flanged or flared connections. 19. The comment about 'water meters being sized and installed by City personnel' is incorrect. You are required to appropriately size and install all water meters. However, we do inspect the installation. 20. You should reference the City of Coppell Standard Construction Detail #3030 when you are noting the water line to be encased in sand. We require the sand to be placed at least 12" above the pipe. 21. All water and sewer installations should be in conformance with TCEQ requirements. 22. If you have not already obtained a copy of our Subdivision Rules and Regulations and our Standard Construction Details, it might be beneficial to have a copy or at least review them on line so that your general notes are in compliance with the City of Coppell's requirements and details. Once these comments have been addressed, a complete set of construction plans should be submitted to the City of Coppell for review. If you should have any questions please feel free to contact this office. Sincerely, ~~ rfA4- Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office (972) 304-3686 Fax (972) 304-7041 Kgriffin@ci.coppell.tx.us