Loading...
Duke Lesley-CS070221 THE.CITY.OF February 21, 2007 C. Jack Evans, P.E. Pacheco Koch Consulting Engineers 8350 N Central Expy, Suite 1000 Dallas TX 75206 RE: Dividend Drive / Point West Blvd., Duke Lesley Addition Construction Plan Review Comments Dear Mr. Evans: The plans as submitted are generally in conformance with City of Coppell standards, with the exception of the following comments: Sheet C3.1 - 1. The proposed 12" sanitary sewer crosses the proposed 6'x4' box culvert. That box culvert should be shown in the profile view. Sheet C5.1 - 2. To calculate your channel capacity for Section BB and Section AA, you are using an 'n' factor of 0.013. This 'n' factor would only be valid if the channel were concrete lined all the way up to the flow line of the water. You should be using a composite 'n' value based on the portion that is concrete lined verses the portion that is not concrete lined. Using a composite value, I am not sure that Section BB will be adequate to convey the water. Please reevaluate. Sheet C5.8 - 3. There is an existing inlet on Belt Line Road that appears to conflict with your proposed drive approach. The inlet will need to be relocated prior to construction of that drive approach. Once these comments have been addressed, you should submit the necessary number of plans for your contractor, plus the City's four copies to be stamped and signed by the City Engineer prior to construction beginning. If you have any questions or need additional information, please contact this office at your convenience. Sin~erelY'i' 1< W\ I )k-- Kenneth M. riffin, P.E. Director of Engineering & Public Works Office Phone: (972) 304-3686 Fax: (972) 304-7041 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673