Loading...
Gateway BP(1.4)-LR070214CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 1:56 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 5016 Ticket No: 7173910 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, OF Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 5.00 7.0 55 43 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Specification 3 -5 3 -6 Report Date: Februa BII7 Project: y Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Field Test Results do not meet project specifications. Page 1 of 7 lierracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (211)6,8„(1,1040 Sample Information Date Cast: December 7, 2006 Time: 2:25 AM Sampled by: Jesus Rojas Weather Conditions: clear Accumulative Yards: 50/690 Placement Method: Pump Sample Locations: Noted on sketch as 1 Placement Location: Paving, refer to attached sketch Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 12/14/2006 7 76,840 2,720 12/14/2006 7 86,990 3,080 Average (7 Days) 2,900 01/04/2007 28 104,210 3,690 01/04/2007 28 109,860 3,890 Average (28 Days) 3,790 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials, 01- PDP,701 -Faure Kev CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 2:32 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 5015 Ticket No: 6295659 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: 2 3 6.00 2 4 6.00 Result 5.25 7.0 55 43 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Page 2 of 7 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Sample Information Date Cast: December 7, 2006 Time: 2:55 AM Sampled by: Jesus Rojas Weather Conditions: Clear Accumulative Yards: 150/690 Placement Method: Pump Sample Locations: Noted on sketch as 2 Placement Location: Paving, refer to attached sketch Field Test Results do not meet project specifications. Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 12/14/2006 7 74,240 2,630 12/14/2006 7 70,830 2,500 Average (7 Days) 2,570 28.27 01/04/2007 28 99,420 3,520 28.27 01/04/2007 28 97,180 3,440 Average (28 Days) 3,480 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- PDR4701 -Fours Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 3:24 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 1093 Ticket No: 7173925 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, °F: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 5.00 6.0 55 38 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 3 1 6.00 28.27 3 2 6.00 28.27 3 3 6.00 28.27 3 4 6.00 28.27 Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information December 7, 2006 Jesus Rojas lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 4:00 AM Date Cast: Sampled by: Weather Conditions: Clear Accumulative Yards: 260/690 Placement Method: Pump Sample Locations: Noted on sketch as 3 Placement Location: Paving, refer to attached sketch Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 7 Date Tested 12/14/2006 12/14/2006 01/04/2007 01/04/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 89,520 3,170 7 96,100 3,400 Average (7 Days) 3,290 28 152,310 5,390 28 147,390 5,210 Average (28 Days) 5,300 01- PDRIRO1- Future Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 4:12 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 7060 Ticket No: 1713934 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, oF: Ambient Temperature,°F: Plastic Unit Weight, pcf: Laboratory Test Data Set No. 4 Specimen ID 1 4 2 Result 5.50 5.8 53 37 N/R Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 4 3 6.00 28.27 4 4 6.00 28.27 Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 7, 2006 Sampled by: Jesus Rojas Weather Conditions: Clear Accumulative Yards: 370/690 Placement Method: Pump Sample Locations: Noted on sketch as 4 Placement Location: Paving, refer to attached sketch Page 4 of 7 Date Tested Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Field Test Results do not meet project specifications. lierracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 4:45 AM Age at Maximum Compressive Test Load Strength (days) (Ibs) (psi) 12/14/2006 7 92,850 3,280 12/14/2006 7 78,660 2,780 Average (7 Days) 3,030 01/04/2007 28 121,340 4,290 01/04/2007 28 128,040 4,530 Average (28 Days) 4,410 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01.PDR/RO1 -FNUre Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 4:52 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 7059 Ticket No: 7173940 Mix I.D. No.: 1261 Water Added Onsite Before Test: O Gallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, OF Ambient Temperature, °F: Plastic Unit Weight, pcf: 5 3 6.00 5 4 6.00 Result 5.50 5.6 55 40 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 5 1 6.00 28.27 5 2 6.00 28.27 Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information December 7, 2006 Jesus Rojas Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Field Test Results do not meet project specifications. Age at Maximum Date Test Load Tested (days) (lbs) 12/14/2006 7 112,460 12/14/2006 7 103,730 Average (7 Days) 28.27 01/04/2007 28 156,210 28.27 01/04/2007 28 154,530 Average (28 Days) lierracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 5:15 AM Date Cast: Sampled by: Weather Conditions: Clear Accumulative Yards: 450/690 Placement Method: Pump Sample Locations: Noted on sketch as 5 Placement Location: Paving, refer to attached sketch Compressive Strength (psi) 3,980 3,670 3,830 5,520 5,460 5,490 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client ind icated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 5 of 7 O1- POR/ROI -FUt,e Hey CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 5:37 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 959 Ticket No: 7173948 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, oF: Ambient Temperature,°F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 6 1 6.00 28.27 6 2 6.00 28.27 6 3 6 4 Result 5.50 5.7 54 38 N/R 6.00 28.27 6.00 28.27 Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 7, 2006 Sampled by: Jesus Rojas Weather Conditions: Clear Accumulative Yards: 560/690 Placement Method: Pump Sample Locations: Noted on sketch as 6 Placement Location: Paving, refer to attached sketch Page 6 of 7 Date Tested 12/14/2006 12/14/2006 01/04/2007 01/04/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 5:55 AM Field Test Results do not meet project specifications. Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 96,210 3,400 7 87,960 3,110 Average (7 Days) 3,260 28 146,300 5,170 28 137,870 4,880 Average (28 Days) 5,030 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- PDR,1701 -FNure Hey CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0017 Service Date: December 7, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 6:16 AM Plant: 7 Supplier: Lattimore Materials Co Truck No: 7025 Ticket No: 7173953 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, °A°: Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 7 1 6.00 28.27 7 2 6.00 28.27 7 3 6.00 28.27 7 4 6.00 28.27 Terracon Rep: Jesus Rojas Report Distribution: (1) Hill Wilkinson LTD (1) Halff Assoc Inc (1) City of Coppell TX 1) Haverty Furniture Co Inc Result 5.00 5.6 53 37 N/R Specification 3 -5 3 -6 Report Date: February 14, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Sample Information Date Cast: December 7, 2006 Time: 7:00 AM Sampled by: Jesus Rojas Weather Conditions: Clear Accumulative Yards: 630/690 Placement Method: Pump Sample Locations: Noted on sketch as 7 Placement Location: Paving, refer to attached sketch Date Tested Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 12/14/2006 7 91,970 3,250 12/14/2006 7 85,060 3,010 Average (7 Days) 3,130 01/04/2007 28 135,090 4,780 01/04/2007 28 136,150 4,810 Average (28 Days) 4,800 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Reviewed by: ene in H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 7 of 7 01.POR/R01- Future Key r 0Z;7.7 t t, "rn 0 X ;00 >0 N./ (•d)l) INIOr NOISNVdX3 441.:1.4 v.g O 0 :0 O 70 Cr". iI t Terracon Report No. 94061357.0017 Dated 12/07/2006 (Haverty Pavement Expansion) C K ZM 0 M X 0 0 -7 0 0 F? Z-1 0 X &CA. --"'7- ...4.......,,,r. IVA01^1] .....t