Loading...
Gateway BP(1.4)-LR070108CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 3:14 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 959 Ticket No: 7174032 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, oF: Ambient Temperature, °F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen No. ID 1 1 1 2 Result 5.50 6.0 55 36 N/R Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Specification 3 -5 3 -6 1[erracon Report Date:January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Sample Information Date Cast: December 9, 2006 Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 80/680 Placement Method: Pump Sample Locations: Noted on sketch as 1 Placement Location: Paving, refer to attached sketch Field Test Results do not meet project specifications. Page 1 of 7 Date Tested 12/16/2006 12/16/2006 01/06/2007 01/06/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM 0138 Time: 3:30 AM Age at Maximum Compressive Test Load Strength (days) (Ibs) (psi) 7 116,770 4,130 7 123,170 4,360 Average (7 Days) 4,250 28 144,850 5,120 28 150,110 5,310 Average (28 Days) 5,220 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- PDR/RO1 -Future Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 3:48 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 1125 Ticket No: 7174037 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, °A): Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: Result 5.50 6.0 50 35 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 6.00 28.27 2 4 6.00 28.27 Specification 3 -5 3 -6 lrerracon Report Date: January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Field Test Results do not meet project specifications. Page 2 of 7 Date Tested 12/16/2006 12/16/2006 01/06/2007 01/06/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Sample Information Date Cast: December 9, 2006 Time: 4:15 AM Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 180/680 Placement Method: Pump Sample Locations: Noted on sketch as 2 Placement Location: Paving, refer to attached sketch Age at Maximum Compressive Test Load Strength (days) (Ibs) (psi) 7 89,300 3,160 7 87,170 3,080 Average (7 Days) 3,120 28 118,890 4,200 28 116,420 4,120 Average (28 Days) 4,160 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01-PDRmot-FWne Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 4:30 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 1093 Ticket No: 7174044 Mix I.D. No.: 1261 VVater Added Onsite Before Test: OGallons Water Added Onsite After Test: 15 Gallons Field Test Data Test Slump, inches: Air Content, °A°: Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: 3 3 6.00 3 4 6.00 Result 5.50 5.5 50 34 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 3 1 6.00 28.27 3 2 6.00 28.27 Specification 3 -5 3 -6 Report Date: January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 9, 2006 Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 290/680 Placement Method: Pump Sample Locations: Noted on sketch as 3 Placement Location: Paving, refer to attached sketch Field Test Results do not meet project specifications. Age at Maximum Compressive Test Load Strength (days) (Ibs) (psi) 7 136,170 4,820 7 147,500 5,220 5,020 28.27 6,060 28.27 5,930 6,000 Page 3 of 7 Date Tested 12/16/2006 12/16/2006 01/06/2007 01/06/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Average (7 Days) 28 171,460 28 167,800 Average (28 Days) lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 5:00 AM Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. O1- PPR/PO1- Future Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 5:14 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 7025 Ticket No: 7174052 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, CF: Ambient Temperature,°F: Plastic Unit Weight, pcf: 4 3 6.00 4 4 6.00 Result 5.75 5.6 50 32 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 4 1 6.00 28.27 4 2 6.00 28.27 Specification 3 -5 3 -6 Report Date: January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 9, 2006 Time: 6:00 AM Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 400/680 Placement Method: Pump Sample Locations: Noted on sketch as 4 Placement Location: Paving, refer to attached sketch Page 4 of 7 01/06/2007 01/06/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 lierracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Field Test Results do not meet project specifications. Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 12/16/2006 7 101,010 3,570 12/16/2006 7 94,910 3,360 Average (7 Days) 3,470 28.27 28 132,760 4,690 28.27 28 127,920 4,520 Average (28 Days) 4,610 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- PDR/RO1- Future Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 5:36 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 980 Ticket No: 6295860 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: Result 5.50 5.8 50 30 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 5 1 6.00 28.27 5 2 6.00 28.27 5 3 6.00 5 4 6.00 Specification 3 -5 3 -6 Report Date: January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Page 5 of 7 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 lierracon 8901 Carpenter Frwy, Ste 7100 Dallas, Texas 75247 (214) 630 -1010 Sample Information Date Cast: December 9, 2006 Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 450/680 Placement Method: Pump Sample Locations: Noted on sketch as 5 Placement Location: Paving, refer to attached sketch Time: 6:30 AM Field Test Results do not meet project specifications. Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 12/16/2006 7 75,280 2,660 12/16/2006 7 77,710 2,750 Average (7 Days) 2,710 28.27 01/06/2007 28 96,440 3,410 28.27 01/06/2007 28 101,560 3,590 Average (28 Days) 3,500 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- P017rti01 -FUtue Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 6:36 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 1042 Ticket No: 7174066 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, °A°: Concrete Temperature, °F: Ambient Temperature, °F: Plastic Unit Weight, pcf: 6 3 6.00 6 4 6.00 Result 6.00 5.5 55 53 N/R Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 6 1 6.00 28.27 6 2 6.00 28.27 Specification 3 -5 3 -6 Report Date:January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 9, 2006 Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 590/680 Placement Method: Pump Sample Locations: Noted on sketch as 6 Placement Location: Paving, refer to attached sketch Field Test Results do not meet project specifications. Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 12/16/2006 7 78,450 2,770 12/16/2006 7 83,480 2,950 Average (7 Days) 2,860 28.27 28 106,600 3,770 28.27 28 105,640 3,740 Average (28 Days) 3,760 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 6 of 7 01/06/2007 01/06/2007 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 7:00 AM O1- PDR/RO1- Future Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061357.0022 Service Date: December 9, 2006 Client: Hill Wilkinson LTD Attn: Gene Fort 800 Klein Rd Ste 100 Plano TX 75074 Material Information Specified Strength: 3000 psi 28 Days Batch Time: 6:54 AM Plant: 7 Supplier: Lattimore Materials co Truck No: 1045 Ticket No: 7174069 Mix I.D. No.: 1261 Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 10 Gallons Field Test Data Test Slump, inches: Air Content, Concrete Temperature, OF: Ambient Temperature, °F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 7 1 6.00 28.27 7 2 6.00 28.27 7 3 6.00 28.27 7 4 6.00 28.27 Terracon Rep: Jesus Rojas Report Distribution: (1) Hill Wilkinson LTD (1) Halff Assoc Inc (1) City of Coppell TX (1) Haverty Furniture Co Inc Result 5.50 5.8 52 37 N/R Report Date: January 08, 2007 Project: Haverty Pavement Expansion 770 Gateway Blvd. PO #14 -2155 Coppell, TX Project No.: 94061357 Sample Information Date Cast: December 9, 2006 Sampled by: Jesus Rojas Weather Conditions: Cloudy Accumulative Yards: 630/680 Placement Method: Pump Sample Locations: Noted on sketch as 7 Placement Location: Paving, refer to attached sketch Specification 3 -5 3 -6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Field Test Results do not meet project specifications. Page 7 of 7 Reviewed by: lierracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Time: 7:30 AM Maximum Compressive Age at Date Test Load Strength Tested (days) (Ibs) (psi) 12/16/2006 7 99,460 3,520 12/16/2006 7 95,360 3,370 Average (7 Days) 3,450 01/06/2007 28 127,830 4,520 01/06/2007 28 123,210 4,360 Average (28 Days) 4,440 Services Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 01- POR/R01 -Future Key DETAIL NELING TING 'EMENT. .74 LF REMOVE CURB TO EXIST. CONCRETE 4s-::*zar t Terracon Report No. 94061357.0022 Dated 12/09/2006 Haverty Pavement Expansion RESTRIPE FIRE LANE