Loading...
Gateway BP(1.4)-LR061206ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing Type Bar Size X Proper Bar Placement X Stirrup Spacing Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X REPORT OF REINFORCING STEEL OBSERVATION Date of Service: Client No.: Client: Services: Drawings Utilized: Test Method: Field Results Report To: Technician: J. Rojas Report Distribution: (1) Hill Wilkinson LTD (1) Halff Assoc Inc (1) City of Coppell TX 12/06/06 72873 Hill Wilkinson LTD 800 Klein Rd Ste 100 Plano, TX 75074 Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Civil Drawings C2.01 /C2.01, dated 10/03/06 Locations /Items Observed: Pavement, see attached sketch Visual Observation REPORT OF OBSERVATION Discrepancies /Comments: No discrepancies were noted at the time of this observation. (1) Haverty Furniture Co Inc lierracon Consulting Engineers Scientists 8901 Carpenter Frwy., Suite 4100 Dallas, Texas 75247 (214) 630-1010 Report No.: 94061357.0013 Project No.: 94061357 Project: Haverty Pavement Expansion 770 Gateway Blvd. Coppell, TX 309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. Hussein H. Abusaad, P.E. Senior Project Manager I' 2 SAWCUT 874 LF REMOVE C CONNECT TO EXIST. CONi�M�|| ]E .E� EXISTING JO|N| ��|vv c N EXISTING PAVEMENT AND NEW PAVEMENT. Terracon Report No. 94061357.0013 Dated 12/06/2006 (Haverty Pavement Expansion) INSTALL 372 OF 6" CURB