Gateway BP(1.4)-LR061206ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings Approved
X
Bar Length and Shape
X
Column Tie Spacing Type
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing Type
Bar Grade
X
Properly Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash Debris Removed
X
Proper Bar Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover /Clearance
X
REPORT OF REINFORCING STEEL OBSERVATION
Date of Service:
Client No.:
Client:
Services:
Drawings Utilized:
Test Method:
Field Results Report To:
Technician:
J. Rojas
Report Distribution:
(1) Hill Wilkinson LTD
(1) Halff Assoc Inc
(1) City of Coppell TX
12/06/06
72873
Hill Wilkinson LTD
800 Klein Rd Ste 100
Plano, TX 75074
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Civil Drawings C2.01 /C2.01, dated 10/03/06
Locations /Items Observed: Pavement, see attached sketch
Visual Observation
REPORT OF OBSERVATION
Discrepancies /Comments: No discrepancies were noted at the time of this observation.
(1) Haverty Furniture Co Inc
lierracon
Consulting Engineers Scientists
8901 Carpenter Frwy., Suite 4100
Dallas, Texas 75247
(214) 630-1010
Report No.: 94061357.0013
Project No.: 94061357
Project: Haverty Pavement Expansion
770 Gateway Blvd.
Coppell, TX
309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.
Hussein H. Abusaad, P.E.
Senior Project Manager
I' 2
SAWCUT 874 LF REMOVE C
CONNECT TO EXIST. CONi�M�||
]E .E� EXISTING
JO|N| ��|vv c N EXISTING
PAVEMENT AND NEW PAVEMENT.
Terracon Report No. 94061357.0013
Dated 12/06/2006
(Haverty Pavement Expansion)
INSTALL 372
OF 6" CURB