Loading...
Vista Point 2R-LR070213 REED EnGlnEEFllnG GEOTECHNICAL AND G R 0 U F' ENVI RONMENT AL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 96 REPORT DATE: 02-13-07 REG PROJECT NO. 13581 DATE OBSERVED: 01-29-07 TECHNICIAN: RHollings PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 15-95'S from 0-70'E from the S.W corner of Building 5 and 0-190'N to 10-70'E from the S.E corner of Building 4. I Reference Plans or Notes Used: I Sheet C6.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/mg 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . fAX [214J 3500019