St Ann Catholic-LR070214CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94061334.0036 Service Date: February 6, 2007 Sample Information Date Cast: February 6, 2007 Time: 7:40 AM Sampled by: Jeremy D. Lehnertz Weather Conditions: Clear Accumulative Yards: 5/5 Placement Method: Direct Discharge Sample Locations: Refer to placement location Placement Location: Sidewalk, in front of Ste. 154 Client: Report Date: February 14, 2007 St Ann Catholic Church Project: St. Ann Catholic Parish Attn: Jennifer Lindsey New Addition 180 Samuel Blvd 180 Samuel Blvd. Coppell TX 75019 Coppell, TX Project No.: 94061334 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 7:02 AM Plant: 3 Supplier: Lattimore Materials Co Truck No: 1049 Ticket No: 3225832 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, OF Ambient Temperature,OF: Plastic Unit Weight, pcf: Result 4.25 3.8 54 47 144.0 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) ( sq. inches 1 1 6.00 28.27 2 6.00 28.27 3 4 Specification Irerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 63 -1010 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days (lbs) (psi) 02/13/2007 7 116,550 4,120 02/13/2007 7 116,570 4,120 Average (7 Days) 4,120 03/06/2007 28 03/06/2007 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep: Jeremy D. Lehnertz Report Distribution: (1) S1 Ann Catholic Church (1) TechniStructures (1) City of Coppell TX (1) Pacheco Koch Consulting Engineers Reviewed by: ov (1) City of Coppell TX A. Bulent Ethem, P.G. (1) Page Southerland Page Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 01.RDR/R01 -F 1 key REPORT OF REINFORCING STEEL OBSERVATION lEstieracon Consultina Enpineers & Scientists 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 (2141630 -1010 Date of Service: Client No Client: Services: Drawings Utilized 02/14/07 106235 Report No.: 94061334.0038 Project No.: 94061334 St Ann Catholic. urch Project: St. Ann Catholic Parish 180 Samuel d New Addition Coppell, T 75019 180 Samuel Blvd. Coppell, TX ObZrve placement of reinforcing for compliance with furnished drawings. C4.1, dated 08/16/06 PROJECT DATA Locations /Items Observed: N Sidewalk of St. Ann Center and 18 Light Pole Piers on N Side of the Center at N Entry Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X Discrepancies /Comments: No discrepancies were noted at the time of this observation. Field Results Report To: Gary Wietleenget w /Strilarnd Technician: E. Jernigan Report Distribution: (1) St Ann Catholic Church (1) City of Coppell TX (1) City of Coppell TX 309acs (1) Page Southerland Page (1) Tech niStructures (1) Pacheco Koch Consulting Engineers B lent Ethem, P. G. Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.