Loading...
Kimbel Addn L8-12R-CS070222DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Kimbel Addition, Lots 8R, 9R, lOR, 11R and 12R, Renlat, being a replat of Lots 7-14 of the Kimbel Addition, to establish fire lanes and easements to allow for the redevelopment of this property for new retail development on 2.9 acres of property located at the northeast corner of Sandy Lake Road and MacArthur Boulevard, at the request of Michael Doggett, Winkelmann & Associates, Inc. STAFF REP.: Marcie Diamond PROJECT ID# RP-07-0007 DRC DATE: February 22, 2007 and March 1, 2007 CONTACT: Kenneth M. Gri cn, P.E., Dir.o En ineerin ublic Works 972/304-3686 COMMENT STATUS: /PRELIMINARY PI~T~ ~€~€~ e rTrn ns~~ Replat 1. Right-of--way or a sidewalk easement should be provided at the northwest corner of Lot 8R. 2. A common access easement should be provided off the fire lane from Lot 9R to the proposed bank access on the east side of Lot 8R. 3. A common access should be provided from Sandy Lake Rd. right-of--way to Lots lOR and 12R. 4. The proposed sanitary sewer easement for the relocated sewer line should be a minimum of 20 foot, not 15 foot as shown. 5. Has this entire tract been purchased by one person? Tax records show several different owners for the proposed five lots. If so, all the owners will need signature blocks on the plat? Preliminary Grading Plat 6. All of Lots lOR, 12R and most of 14R should drain south and east to the existing inlets and pipes installed with the Sandy Lake Rd. improvements. 7. All drainage should be picked up on site for those areas and discharged to the appropriate locations. 8. The proposed location of your driveway onto Sandy Lake Rd. conflicts with an existing inlet. Either the inlet or the driveway needs to be relocated. 9. Information should be provided on how Lots 8R, 9R and the remainder of Lot 14R will drain. Preliminary Utility Plan P-3 10. The notes on the plan should be enlarged so that they can be properly read. In particular, the notes associated with the CVS Pharmacy cannot be read. 11. No water/sewer services are being shown for Lot 14R. If you are utilizing existing water/sewer services for Lots 9R and 12R, they should still be shown. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.' PD-223-C, Kimbel Addition, zoning change request from C (Commercial) to PD-223-C (Planned Development 223-Commercial) to allow the construction of three retail/restaurant/medical buildings, a bank and the retention of a portion of an existing retail structure, totaling 25,245-square-feet, and to allow the reduction in landscaped areas, required setbacks and alternative signage colors and sizes on 2.9 acres of property located at the northeast corner of Sandy Lake Road and MacArthur Boulevard, at the request of Alen Hinckley, Yorkshire Realty Advisors, LP. STAFF REP.: Marcie Diamond PROJECT ID# PD-07-0006 DRC DATE: February 22, 2007 and March 1, 2007 CONTACT: Kenneth M. P.E.. Dir Works 972/304-3686 COMMENT STATUS: /PRELIMINARY Tree Survey Landscape Plan L1 1. No trees should be placed within the sewer easement. It appears that two trees on Lot 9R and one tree on Lot 14R are being proposed within the sewer easement.