DR9202-CS 911030 ALBERT H. HALFF ASSOCIATES. INC. J1J 0O, T 3 I IOO w. i! ' ENGINEERS. SCIENTISTS * SURVEYORS i Ocx)ber30, 1991 By: Engineeri~-,::2 7)1008-91-3915 DALLAS · ARLINGT(.)N · CHICAG() · FORT WOR'fH ............... M. Shohre Daneshmand, P.E. City of Coppe]! P.O. Box 478 Coppell, TX 7~019 Dear Shohre: Attached please find engineering services proposals for the Phase 1 drainage improvement projecls discussed on Monday. Two proposals are provided for Brooks Lane to aid city staff in choosing the best approach to this project. The first proposal is an engineering services budget of $3,896.00 for the preparation of construction plans for the two inlets on Brooks Lane. The property owner could 'also be advised at this time of flood proofing methods, such as driveway curbing. The second Brooks Lane proposal is for exploring other design options as well as preparation of construction plans for the diversion. Table 1 summarizes the engineering services budgets from the attached proposals and the estimated construction costs from the City-Wide Storm Water Management Plan. Please note that each of these contracts may be executed separately for your convenience. It may be advantageous to indicate this in your council package so that if there are questions concerning one contract, others can proceed in a timely manner. Table 2 is a suggested implementation schedule which would allow city staff to coordinate implementation and/or construction with current manpower. As we discussed the enclosed contracts would provide services through the completion of construction plans and specifications. City staff could handle bidding, award, administration and inspection of the project or these services could be handled by separate contract with a consultanL This allows for the determination of staff availability after the first of the year. Several projects could also be combined with one bid opening and one set of contract documents which may provide additional cost savings to the city. "Halff Associates is prepared to begin work immediately upon council approval. Please let us know if these drainage projects will be on the November 12th council agenda, so that we may be present to answer any questions. Contracts may be initiated by returning one signed original for our files. We look forward to working with you on the implementation of Phase 1 of the City-Wide Storm Water Management Plan. Please feel free to call if you have any questions. Yours very truly, ALBERT H. HALFF ASSOCIATES, INC. an Hansen, P.E. Attachments cc: v/Gary Sieb, City of Coppell TABLE I Summary of Drainage Projects Phase 1 Implementation PROJECT ESTIMATED ESTIMATED ENGINEERIANG CONSTRUCTION FEE~) COSTa) v Brooks Lane (Inlets Only/Stage I)3 $3,896.00/$20,548.00 $10,600.00/$115,000.00 Sandy Knoll/Shadowcrest/ $8,687.00 $26,700.00 " Woodhurst Meadows Stage I $7,200.00 $30,000.00 / Meadows Stage II $16,700.00 $100,000.00t4~ Grapevine Creek $44,021.00 ...... ts) TOTALS $80,504.00/$97,156.00 $167,300.00/$271,700.00 (1) Includes survey for design, design, construction documents (including specifications) preparation and easement document preparation. Advertising for bids, construction surveys and inspection and geotechnical services are not included. aD From City-Wide Sto,m Water Management Study (contingencies not included). Two proposals are included with this package. Inlets only add minimal capacity to the system. Stage 1 provides 25-year capacity. tn) Possible developer participation? ts) Preliminary Design only at this stage, Final Design and Construction to be implemented by affected property owners. Estimated Construction Cost is $1,350,000 to protect all of the homes threatened by erosion. TABLE 2 POSSIBLE IMPLEMENTATION SCHEDULE DRAINAGE IMPRO¥~MENTS TIMETABLE TASK January 1992 Construction Plans - City Review: Brooks Lane Sandy Knoll/S hadowcrest/Woodhurst February 1992 Bidding and Conlract Award: Brooks Lane Sandy Knoll/S hadowcre st/~Voodhurst March 1992 Award Contract/Begin Construction: Brooks Lane Sandy Knoll/Shadowcrest/Woodhurst Construction Plans - City Review: Meadows - Stage I and Stage II April 1992 Inspection: Brooks Lane Sandy Knoll/S hadowcrest/Woodhurst Negotiations and Bidding: Meadows Subdivision May 1992 Complete Construction: Brooks Lane Sandy Knoll/S hadowcre stfWoodhurst Contract Award: Meadows Subdivision Initial Plan Review: Grapevine Creek Erosion Control June 1992 Inspection: Meadows Subdivision Plan Coordination and Review: Grapevine Creek Erosion Control July 1992 Inspection and Complete Construction: Meadows Subdivision Plan Finalization and Presentations: Grapevine Creek Erosion Control Notes: 1) Construction Schedules are dependent upon weather conditions 2) Brooks Lane and Meadows Subdivision may have longer construction schedules if the diversions are built at this time.