Loading...
Stonemeade-LR 930817MAXIM ENGINEERS, INC. 2342 Fabens • P.O. Box 59902 • Dallas, TX 75229 Engineering a nd Environmental Consultants (214) 247 -7575 • FAX (214) 484 -5804 CONCRETE CYLINDER TEST REPORT Report Date 08/17/93 Sample Date 07/17/93 Standard 6" X 12" Area 28.27 Square inches To Centex Real Estate Project # 0393000701 Project Stonemeade Estates - Paving - Coppell, Texas Contractor Mario Sinacola Location of Placement Left turn lane MATERIALS Source Design Batch OTHER DATA s./ Description Wts. (Lbs. /Cu.Yd.) Mix No.: Concrete Supplier: Mario Sinacola Cement: Ticket No.: N/A Truck No.: 72 -72 Fly Ash: Time Batched: N/A Sampled: 9:50 am Coarse Aggregate: Temperature ( °F) Ambient: 85 Concrete: 80 Fine Aggregate: Weather Conditions: N/A Water Added: 0 gallons Batched: Entrained Air Content (%): 5.5% Admixtures: (ASTM C -231) Specimen Number Age Date Tested Slump In. Total Load Lbs. Compressive Type of Strength Required (Days) Strength P.S.I. Fracture P.S.I. /days SMP 81 7 07/24/93 6 83500 2953 3000/28 82 7 07/24/93 83600 2957 E 83 28 08/14/93 103400 3657 a 84 28 08/14/93 108000 3820 a Curing ASTM C -31 Test Method Cylinders Made By Cylinders Tested By Slump ASTM C -143 ASTM C -39 A. Campbell I. Lopez Remarks and /or Distribution Unit Weight 146.7 LBS /CF /cey Centex Real Estate Corporation - Derek Earle, P.E. City of Coppell - Larry Davis City of Coppell - Garreth D. Campbell Sr. This report is for the sole use of the client addressed. The use of our company name must receiveour prior written consent. This reportapplies only to the sampple tested, and does not necessarily represent identical or similar samples. SMP81 (210277) MAXIM FTN:INFITHS, IN(: