Loading...
Stonemeade-LR 930311MAXIM ENGINEERS, INC. 2342 Fabens • P.O. Box 59902 • Dallas, TX 75229 Engineering and Environmental Consultants (214) 247 -7575 • FAX (214) 484 -5804 IN -PLACE DENSITY OF SOIL Report Date 03/11/93 Sample Date 02/23/93 Client Centex Real Estate Project Number 0392002035 Project Name Stonemeade Estates - Coppell, Texas (lbs /cu. ft.) Density Test Method ASTM D2922 and D3017 Method of Compaction ASTM D698 Project Density Req'd 95+ Project Moisture Req'd Sand - _*3 Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture % 1 Brown and dark brown clay sand 112.9 14.7 2 Tan and yellow brown sand 112.4 10.5 T &St Results. Test Material Lift Location Dry Density Moisture % of Maximum Number Number (lbs /cu. ft.) Content ( %) Dry Density 35 1 Final Line E storm sewer, station 0 +50 110.2 17.6 97.6 36 2 Final Line F storm sewer, station 0 +50 109.8 15.1 * 97.7 37 2 Final Line F storm sewer, station 1 +75 103.2 16.1 * 91.8 ** 38 2 Final Retest 36, dated 02 -23 -93 112.8 13.5 100.4 39 2 Final Retest 37, dated 02 -23 -93 113.7 13.5 101.1 * Does not meet required project moisture specifications. ** Does not meet required project density specifications. Technician: B. Lucas /cey Centex Real Estate Corporation - Derek Earle, P.E. C. W. Young City of Coppell - Larry Davis V Zity of Coppell - Garreth D. Campbell, Sr. This report is for the sole use of the client addressed. The use of our company name must receive o r prior written consent. This report applies only to the sample tested, and does not necessarily represent identical or similar samples. SM019 MAYM SMAJMF34K_ ni[' MAXIM ENGINEERS, INC. Engineering and Environmental Consultants 2342 Fabens 0 P.O. Box 59902 • Dallas, TX 75229 (214) 247 -7575 • FAX (214) 484 -5804 IN -PLACE DENSITY OF SOIL Report Date 03/11/93 Sample Date 02/23/93 Client Centex Real Estate Project Number 0392002035 Project Name Stonemeade Estates - Coppell, Texas (lbs /cu. ft.) Density Test Method ASTM D2922 and D3017 Method of Compaction ASTM D698 Project Density Reci'd 95+ Project Moisture Reci'd Sand ±3 Material Number Description 1 Brown and dark brown clay sand 2 Tan and yellow brown sand Proctor Results Maximum Dry Density (pcf) 112.9 112.4 Optimum Moisture % 14.7 10.5 Test Material Lift Location Dry Density Moisture % of Maximum Number Number (lbs /cu. ft.) Content ( %) Dry Density 35 1 Final Line E storm sewer, station 0 +50 110.2 17.6 97.6 36 2 Final Line F storm sewer, station 0 +50 109.8 15.1 * 97.7 37 2 Final Line F storm sewer, station 1 +75 103.2 16.1 * 91.8 ** 38 2 Final Retest 36, dated 02 -23 -93 112.8 13.5 100.4 39 2 Final Retest 37, dated 02 -23 -93 113.7 13.5 101.1 * Does not meet required project moisture specifications. ** Does not meet required project density specifications. Technician: B. Lucas /cey Centex Real Estate Corporation - Derek Earle, P.E. ,C. W. Young ```City of Coppell - Larry Davis r�J City of Coppell - Garreth D. Campbell, Sr. 1% This report is for the sole use of the client addressed. The use of our company name must receive o r prior written consent. This report applies only to the sample tested, and does not necessarily represent identical or similar samples. SM019 MAXIM ENGWEERS. INC