Loading...
Huntington-CS 930301 ~~ y With A Beautiful Future PRE-CONSTRUCTION PACKET PROJECT NAME: ` P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 DATE : _?Z_l -" y 3 TIME: ~ ~~ 3~ fJ~'yr1 ! ATTENDANCE SHEET Np,~ ; COI~ANY : PHONE: ~ 1 ~ 'D~2~~ ~gaL~ c~~ ~ ~2~ ~s-ss6 CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME : ( J~ j~ Q VL, ~l ~f ~` DATE : _ ^- ~' -~ _T . TIME : Zj ~ ' ASSIGNED INSPECTOR: I. ATTENDANCE: (See Attached List) II. PLANS FURNISHED TO: A) B) C) CITY YES NO CONTRACTOR YES NO OWNER YES NO III. UTILITY COMPANIES NOTIFIED: A) TELEPHONE B) GAS C ) ELECTRIC ~! ~ 5- D) CABLE T.V. E) OTHER " IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASENIENIS YES NO HIGHWAY PERMIT YES NO RAILROAD PERMIT YES NO STREET CUT PERMIT YES NO BORING PERMIT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR B. AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID. BY THE CONTRACTOR "AT OVERTIME RATES" ~, C. CONTRACTOR AND SUB-CONTRACTORS TO NO'PIF'Y INSPECTOR AT LEAST TuJENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORM SEWER/ PAVING CONSTRUCTION BEGINS. ( 2 ) M~ ~ a~ VI. TESTING OF MATERIALS: 1. DENSITIES 2. •APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES ~ IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPAR'IT9ENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED Y~ ~ B. TRAFFIC DETOUR YES ~ C. WARNING LIGHTS Y~ ~ " IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: J NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: ( 3 )