Huntington-CS 930301
~~
y With A Beautiful Future
PRE-CONSTRUCTION PACKET
PROJECT NAME: `
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
DATE : _?Z_l -" y 3
TIME: ~ ~~ 3~ fJ~'yr1 !
ATTENDANCE SHEET
Np,~ ; COI~ANY : PHONE:
~ 1 ~
'D~2~~ ~gaL~ c~~ ~ ~2~ ~s-ss6
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
PROJECT NAME : ( J~ j~ Q VL, ~l ~f ~`
DATE : _ ^- ~'
-~ _T .
TIME : Zj ~ '
ASSIGNED INSPECTOR:
I. ATTENDANCE: (See Attached List)
II. PLANS FURNISHED TO: A)
B)
C)
CITY YES NO
CONTRACTOR YES NO
OWNER YES NO
III. UTILITY COMPANIES NOTIFIED:
A) TELEPHONE
B) GAS
C ) ELECTRIC ~! ~ 5-
D) CABLE T.V.
E) OTHER
" IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
EASENIENIS YES NO
HIGHWAY PERMIT YES NO
RAILROAD PERMIT YES NO
STREET CUT PERMIT YES NO
BORING PERMIT YES NO
V. INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
B. AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID. BY THE CONTRACTOR "AT OVERTIME
RATES" ~,
C. CONTRACTOR AND SUB-CONTRACTORS TO NO'PIF'Y
INSPECTOR AT LEAST TuJENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SEWER/STORM SEWER/
PAVING CONSTRUCTION BEGINS.
( 2 )
M~ ~ a~
VI. TESTING OF MATERIALS:
1. DENSITIES
2. •APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES ~
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPAR'IT9ENT SEVENTY-TWO (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED Y~ ~
B. TRAFFIC DETOUR YES ~
C. WARNING LIGHTS Y~ ~
" IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
J
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
( 3 )