Loading...
DR9604-CS 960516R~PLY TO ATTENTION OF: DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P.O. BOX 17300 FORT WORTH, TEXAS 76102-0300 May 16, 1996 Planning Division Mr. Ken Griffin Assistant City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Mr. Griffin: I have enclosed a copy of a concept plan for the proposed environmental restoration, streamba~k erosion, and recreation cost shared feasibility study along Denton Creek, as discussed on April 30, 1996, between you and representatives of the Fort Worth District (Mr. Gene T. Rice, Jr, and Mr. Ron Ramirez). This concept lists possible locations and various project features that are under consideration for study. After you and your staff have reviewed the draft concept, we would like to hold a follow on meeting to discuss the City's continued interest in undertaking the proposed investigations. We would like to tentatively schedule this meeting for the week of May 27-31, 1996. The pul~ose of this meeting would be the initiation of detailed negotiations on the scope of study requirements and associated costs for this feasibility study. After the negotiations are completed, we will prepare a Project Study Plan (PSP) as documentation of the work effort and cost for this project. Thank you for your cooperation and enthusiasm for this project. If you have questions and/or need other information, please call Mr. Rice at (817) 334-2187. Sincerely, Fickel, Chief, Planning DiviSion Enclosure Copy Furnished Mr. Tim Timulty City Engineer P.O. Box 110535 Carrollton, Texas 75011-0535