Loading...
Huntington-LR 930302MAXIM ENGINEERS, INC. Engineering and Environmental Consultants 2342 Fabens • P.O. Box 59902 ~ Dallas, TX 75229 (214) 247-7575 ~ FAX (214) 484-5804 IN-PLACE DENSITY OF SOIL ~ Report Date 03/02/93 Sample Date 02/19/93 Client Centex Real Estate Project Number 0392002034 Project Name Huntington Ridge -Coppell, Texas Density Test Method ASTM D2922 and D3017 Method of Compaction ASTM D698 Project Density Req'd g5+ Project Moisture Req'd Opt 5 MosturelDensty Relations Material Proctor Results Number Description Maximum Dry Density (pcff Optimum Mcisture 1 Brown silty clay, brown clay balls with gray seams 116.9 12.9 2 Dark brown clay with calcareous nodules 99.3 20.9 3 Brown and dark brown clay sand with roots 112.9 14.7 Test Results Test Material Lift Location Dry Density Moisture °~ of Maximum Number Number {Ibs/cu. ft.) Content (%) Dry Density 91 1 Natural House pad, block A, lot 7 113.6 16.7 97.2 92 2 Natural House pad, block A, lot 5 100.1 21.5 100.8 93 3 Natural House pad, block A, lot 3 108.1 19.7 95.8 94 1 Natural House pad, block A, lot 1 119.1 15.6 101.9 All densities meet project specifications unless otherwise noted. Technician: B. Lucas /cey Centex Real Estate Corporation -Derek Earle, P.E. ` ~,/ Rodman Excavation -Rod Vilhouer City of Coppell -Larry Davis~- City of Coppell - Garreth D. Campbell, Sr. This report is for the sole use of the client addressed. The use of our rnmpany name must receive our prior written rnnsent. This report applies only to the sample tested, and does not necessarily represent identical or similar samples. HR007 M~umr txc~~s, trrC