Loading...
Huntington-LR 930122MAXIM ENGINEERS, INC. 2342 Fabens • P.O. Box 59902 • Dallas, TX 75229 Engineering and Environmental Consultants (214) 247-7575 • FAX (214) 484-5804 MOISTURE DENSITY RELATIONSHIP REPORT Report Date 01/22/93 Sample Date 01/19/93 T° Centex Real Estate Project # 03920020. Project Huntington Ridge - ppell, Texas Identification ations of Soil Test Procedure ~~ D-698C, ASTM D-4318 Results Rammer Type ................................... Mechanical Preparation Procedure ............................. Moist Material Description .............................. Extremely weathered tan limestone Material Origin .................................. On-Site Liquid Limit .................................... 55 Plastic Limit .................................... 22 Plasticity Index .................................. 33 Maximum Density ................................ 92.4 lbs./cu.ft. Optimum Moisture ............................... 26.9 percent Technician: R. Pleasant /br Centex Real Estate Corporation -Derek Earle, P.E. Rodman Excavation -Rod Vilhouer City of Coppell -Larry Davis -- City of Coppell - Garreth D. Campbell, Sr. Thk report is for the sole use of the dcent addressed. The use of our rnmpany name must receive our prior written mnsent. This~re rt applies only to the sample tested, and does not necessarily representidendcal or similar samples. ~~%L~G9 ~,~ 01008 ~ Matcatrrr~s, n+c _ /~t/~