Huntington-LR 930122MAXIM ENGINEERS, INC. 2342 Fabens • P.O. Box 59902 • Dallas, TX 75229
Engineering and Environmental Consultants (214) 247-7575 • FAX (214) 484-5804
MOISTURE DENSITY RELATIONSHIP REPORT
Report Date 01/22/93 Sample Date 01/19/93
T° Centex Real Estate
Project # 03920020.
Project Huntington Ridge - ppell, Texas
Identification ations of Soil
Test Procedure ~~ D-698C, ASTM D-4318
Results
Rammer Type ................................... Mechanical
Preparation Procedure ............................. Moist
Material Description .............................. Extremely weathered tan limestone
Material Origin .................................. On-Site
Liquid Limit .................................... 55
Plastic Limit .................................... 22
Plasticity Index .................................. 33
Maximum Density ................................ 92.4 lbs./cu.ft.
Optimum Moisture ............................... 26.9 percent
Technician: R. Pleasant
/br
Centex Real Estate Corporation -Derek Earle, P.E.
Rodman Excavation -Rod Vilhouer
City of Coppell -Larry Davis --
City of Coppell - Garreth D. Campbell, Sr.
Thk report is for the sole use of the dcent addressed. The use of our rnmpany name must receive our prior written mnsent. This~re rt applies only to the sample tested, and
does not necessarily representidendcal or similar samples. ~~%L~G9 ~,~ 01008
~ Matcatrrr~s, n+c _ /~t/~